Skip to main content

UDOT launches variable speed limit system

The Utah Department of Transportation (UDOT) has installed a new US$750,000 electronic sign system on Interstate 80 in Parleys Canyon that will allow engineers to adjust the speed limit during storms or icy weather. Eight electronic signs are in eastbound lanes, and seven in westbound lanes. Data from road sensors shows the road condition, along with the canyon’s temperature and humidity and traffic speed, while cameras will show visibility, enabling traffic engineers to remotely adjust the speed limit s
January 8, 2014 Read time: 1 min
The 1904 Utah Department of Transportation (UDOT) has installed a new US$750,000 electronic sign system on Interstate 80 in Parleys Canyon that will allow engineers to adjust the speed limit during storms or icy weather. Eight electronic signs are in eastbound lanes, and seven in westbound lanes.

Data from road sensors shows the road condition, along with the canyon’s temperature and humidity and traffic speed, while cameras will show visibility, enabling traffic engineers to remotely adjust the speed limit signs and send alerts to the Utah Highway Patrol.

"Its whole aim is to improve safety and the consistency of flow in Parleys Canyon during weather events," said Robert Miles, UDOT Region 2 East District engineer. "We’re excited about it. We think we can really affect the safety and capacity of the roadway."

Related Content

  • July 24, 2012
    Righter shade of pale
    Jon Tarleton, Quixote Transportation Technologies, Inc., talks about developments in mobile weather information gathering Quixote Transportation Technologies, Inc. (QTT) is promoting the greater use of mobile technologies to provide infill between fixed Road Weather Information System (RWIS) infrastructure. It is, the company says, a means of reducing the expense of providing comprehensive, network-wide coverage, particularly in geographic locations where the sheer number of centreline miles causes cost to
  • January 31, 2012
    Innovative traffic information system
    From the roadside James Foster compiles some eye-catching news, deployments and product picks from the work zone
  • September 19, 2017
    Michigan fosters real-world testing of workzone ITS
    Turning a ‘problem’ into ‘an opportunity’ is the mantra of just about every business book and Michigan Department of Transportation (MDoT) looks set to achieve that aim in Oakland County, where 29km (18 miles) of the I-75 needs to be reconstructed. Running north-northwest from Detroit, the I-75 carries around 170,000 vehicles per day but, being built in the 1970s, it now requires an additional lane in each direction and upgrading to the latest design and safety standards. Upgrading will be carried out in
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab