Skip to main content

UDOT launches variable speed limit system

The Utah Department of Transportation (UDOT) has installed a new US$750,000 electronic sign system on Interstate 80 in Parleys Canyon that will allow engineers to adjust the speed limit during storms or icy weather. Eight electronic signs are in eastbound lanes, and seven in westbound lanes. Data from road sensors shows the road condition, along with the canyon’s temperature and humidity and traffic speed, while cameras will show visibility, enabling traffic engineers to remotely adjust the speed limit s
January 8, 2014 Read time: 1 min
The 1904 Utah Department of Transportation (UDOT) has installed a new US$750,000 electronic sign system on Interstate 80 in Parleys Canyon that will allow engineers to adjust the speed limit during storms or icy weather. Eight electronic signs are in eastbound lanes, and seven in westbound lanes.

Data from road sensors shows the road condition, along with the canyon’s temperature and humidity and traffic speed, while cameras will show visibility, enabling traffic engineers to remotely adjust the speed limit signs and send alerts to the Utah Highway Patrol.

"Its whole aim is to improve safety and the consistency of flow in Parleys Canyon during weather events," said Robert Miles, UDOT Region 2 East District engineer. "We’re excited about it. We think we can really affect the safety and capacity of the roadway."

For more information on companies in this article

Related Content

  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • Dynamic lane closures cuts time, cost and congestion on Motorway roadworks
    March 17, 2014
    A combination of technologies is leading to major congestion and cost reductions during roadworks on the UK’s motorway network. Innovative construction programme scheduling technology and the deployment of moveable barriers has achieved substantial savings of money and time on UK motorway roadworks managed by the Highways Agency (HA). This combination has set the scene for a new generation of road usage analysis tools. The HA’s objective was to reduce the congestion caused by lane closures during roa
  • Data handling important for autonomous vehicles
    December 8, 2016
    Data handling is becoming an ever-greater part of transportation and never more so than with autonomous vehicles, as Andrew Bardin Williams hears from some big names.