Skip to main content

'Smart' motorways on their way to Greater Manchester

Details of a multi-million pound project have been unveiled that will cut congestion and improve journey times on parts of the M60 and M62 in Greater Manchester. The smart motorways scheme – the first of its kind in the north-west – will be introduced on a 17-mile stretch of the network between junction 8 of the M60 near Sale and junction 20 of the M62 near Rochdale. The system will use the latest technology to monitor traffic levels, provide traffic information to road users, and ease congestion by usin
November 8, 2013 Read time: 3 mins
Details of a multi-million pound project have been unveiled that will cut congestion and improve journey times on parts of the M60 and M62 in Greater Manchester.

The Smart motorways scheme – the First of its kind in the north-west – will be introduced on a 17-mile stretch of the network between junction 8 of the M60 near Sale and junction 20 of the M62 near Rochdale. The system will use the latest technology to monitor traffic levels, provide traffic information to road users, and ease congestion by using variable speed limits on overhead signs.

The hard shoulder will also be permanently converted into an extra lane on a five-mile stretch of the M62 between junctions 18 and 20 to provide extra capacity on the part of the motorway which links the North West to Yorkshire.

Emergency refuge areas will be created on this section of motorway with overhead signs used to alert motorists of lane closures and incidents ahead, clearing lanes to allow emergency vehicles to get through.

The 503 Highways Agency is also analysing the environmental impact of increasing lane capacity between junctions 8 and 15 of the M60, which is currently made up of two and three-lane carriageways. This could include converting the hard shoulder to an extra lane, but the potential impact on local communities will need further assessment to ensure there is no adverse impact to the local environment.
The scheme, which has a current cost-range of US$305 million to US$429 million, is designed to support economic growth by alleviating congestion, which is estimated to cost the economy US$3.2 billion every year.

A similar project recently completed on the M62 near Leeds is already being welcomed by road users and local businesses as it is making journeys better and reducing congestion.

Jacqui Allen, senior project manager at the Highways Agency, said: “More than 180,000 vehicles use the section of motorway between Junction 8 of the M60 and Junction 20 of the M62 every day, causing heavy congestion and unpredictable journey times. The new Smart motorway system will help tackle these issues as well as improving safety on the network.

“It may seem odd that reducing speed limits can also reduce journey times, but evidence shows that it does exactly that. By encouraging everyone to drive at similar speeds, it brings an end to the stop-start conditions most motorists will have experienced during busy times.

“Converting the hard shoulder to an extra lane on the section of the M62 between junctions 18 and 20 will also provide much-needed additional capacity, increasing the number of lanes on each side of the motorway from three to four.”

Work on the project is due to start in summer 2014 (subject to the completion of statutory processes), and to be completed in 2016/17, when more than 300 new electronic signs on the M60 and M62 will warn drivers of changes in the mandatory speed limit, lane closures, and incidents ahead. Around 50 new CCTV cameras will also be used to monitor traffic levels from the Highways Agency’s Regional Control Centre at Newton-le-Willows in Merseyside.

Related Content

  • February 12, 2013
    M62 managed motorway scheme signs switched on
    Work to upgrade part of the M62 in West Yorkshire to a managed motorway, the first scheme in the Yorkshire and Humber region, reached a significant milestone when the first overhead electronic signs went live. For the first time, the variable advisory speed limit signs have come into operation between junctions 27 and 28 to allow the UK Highways Agency to calibrate and test the technology required for the new managed motorway, with the signs being switched on and off in response to traffic conditions. Advis
  • January 15, 2014
    South west’s first smart motorway opens
    The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
  • April 8, 2014
    UK defaults to hard shoulder running to expand motorway capacity
    Hard shoulder running has become the UK’s default response to increasing motorway capacity as Colin Sowman reports. Facing a predicted 46% increase in traffic levels by 2040 and the current economic recovery leading to more people travelling to, from and for work leaves the UK government under short- and long-term pressure to increase the capacity on the main motorway network. Particular sections of motorways are already experiencing repeated, sometimes tidal, congestion and both tight Treasury limits and t
  • November 10, 2014
    M25 upgraded to ‘smart’ motorway
    Road users on the vast majority of the UK’s M25 will benefit from four-lane capacity now that the final section between junctions 25 and 27 has become a smart motorway. The road has been upgraded from three to four lanes in each direction, with the hard shoulder converted for use as a permanent traffic lane and enhanced on-road technology to manage traffic flow to improve the reliability of journey times, providing a boost for businesses and the wider economy.