Skip to main content

M25 becomes UK’s smartest motorway

Final preparations are taking place for the M25 to become England’s first smart motorway, improving journeys and boosting the economy. Two sections of the motorway opening this month and next are between junctions 23 and 25 in Hertfordshire and between junctions 5 and 6/7 on the Kent/Surrey border. For the first time on a motorway scheme in England the hard shoulder will be used as a permanent traffic lane, with enhanced technology to manage traffic flow to improve the reliability of journey times.
April 11, 2014 Read time: 2 mins
Final preparations are taking place for the M25 to become England’s first smart motorway, improving journeys and boosting the economy.

Two sections of the motorway opening this month and next are between junctions 23 and 25 in Hertfordshire and between junctions 5 and 6/7 on the Kent/Surrey border.

For the first time on a motorway scheme in England the hard shoulder will be used as a permanent traffic lane, with enhanced technology to manage traffic flow to improve the reliability of journey times.

The improvements, spanning some 20 miles of the M25, are part of a new generation of technology-driven improvements on the strategic road network known as ‘smart motorways’.

The advance on the M25, which will be repeated on other motorways, is the permanent conversion of the hard shoulder for traffic, providing 24/7 extra capacity.

John Martin, 503 Highways Agency senior project manager said: “Around US$3 billion is being invested into roads in the south east by 2021 with 145 new lane miles of capacity added. Most of the work to improve journeys on these stretches in Hertfordshire and Kent/Surrey is complete and we are now testing the new technology. “We are delighted to be able to open the first part of the northern section ahead of the planned full completion in December 2014. The southern section is completing significantly earlier than planned due to rescheduling of the programme.

“Soon the smart motorway will be complete and we are now asking drivers to get smart and find out more about how to use it, the types of signs and signals they will see and what to do in the event of a breakdown. “This really is the start of a new age on England’s motorways.”

For more information on companies in this article

Related Content

  • Do satellites provide a heavenly view of tolling’s future?
    December 16, 2014
    Satellite-based tolling opens up new options for authorities and can be integrated with DSRC systems as David Crawford discovers. As the proud custodian of the European Union (EU)’s longest road network covered by a single (truck) charging scheme – and the only one to include all major roads - Slovakia has become the continent’s poster-nation for the virtues of GNSS/CN (Global Navigation Satellite System/Cellular Network)-based tolling. It is also proved to be a very fast implementer. Speaking at the 2014 I
  • Stepped speed limits improve workzone congestion and safety
    January 30, 2012
    Traffic flow has been improved, congestion eased and safety increased - by a system of 'stepped speed limits' introduced to UK roadworks. URS Scott Wilson principal consultant Jamie Uff reports
  • Feasibility study to look at use of dynamic wireless power transfer on UK roads
    March 13, 2015
    The UK’s Transport Research Laboratory (TRL) has been commissioned by the Highways Agency to undertake a feasibility study into whether dynamic wireless power transfer (WPT) technology can be used on England’s motorways and major A roads, the Strategic Road Network, to prepare for and potentially encourage, greater EV take-up. This study is the first part in a much larger programme of research and trialling for dynamic WPT technology to be undertaken in the UK. TRL was selected to deliver the feasibility st
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.