Skip to main content

San Mateo Smart Corridor project

San Mateo County in California is to implement a US$35 million dollar smart corridor project which will apply the latest management technology along twenty miles of El Camino Real from San Bruno to Menlo Park and on local streets in San Mateo County. “We’re working together to help people get to where they are going easier and faster,” said Caltrans Director Malcolm Dougherty. “This is a good example of how technology can help us make better use of the roads we already have.” The Intelligent Transportation
November 9, 2012 Read time: 2 mins
San Mateo County in California is to implement a US$35 million dollar smart corridor project which will apply the latest management technology along twenty miles of El Camino Real from San Bruno to Menlo Park and on local streets in San Mateo County.

“We’re working together to help people get to where they are going easier and faster,” said 3879 Caltrans Director Malcolm Dougherty. “This is a good example of how technology can help us make better use of the roads we already have.”

The Intelligent Transportation System (ITS) includes a fibre optic communication system that will connect to Caltrans’ Transportation Management Center in Oakland and ten San Mateo County cities; electronic message signs that guide motorists through detour routes during freeway incidents; sensors providing information about the volume of traffic at specific locations; and closed circuit television cameras allowing Caltrans and the ten cities to monitor traffic flow and determine the most effective way to reroute motorists during major congestion.

“Drivers will benefit from this innovative use of technology,” said Rich Napier, executive director of the city/county Association of Governments of San Mateo County. “When a traffic incident occurs, motorists will be provided with real-time information to help them choose whether to remain on the highway, choose a detour, or travel to the nearest public transit station.”

One of the major benefits of the project is that it will link more than 250 state and local traffic signals, enabling the signal timing to be adjusted remotely to better manage the flow of traffic during incidents, eliminating the need to drive to the signal to make adjustments.

The project also will improve communication and coordination among emergency responders, local agencies and Caltrans because they will all have access to the same information.

“We are excited to be a part of this cooperative effort to improve travel in San Mateo County,” said Bijan Sartipi, Caltrans District 4 Director. “Smart corridor projects are an important component of Bay Area mobility and Caltrans is working with its partners to blaze a trail on this promising new technology.”

Related Content

  • November 15, 2024
    How ITS helped Coachella get its groove back
    California’s Coachella Valley attracts visitors to myriad music and sports events. But now an ambitious traffic management initiative aims to cut travel times and reduce emissions. Adam Hill talks to the engineers involved in the massive CV Sync project
  • January 16, 2023
    Iteris on board with California express
    San Bernardino County Transportation Authority awards $2.8m traffic deal on I-10
  • March 14, 2012
    Bridging the highway travel information gap
    A new traffic management solution is attempting to bridge the gap in information available on freeways and arterial roadways. Andrew Bardin Williams reports. Agencies responsible for national networks of roads around the world have the ability to measure, analyse and disseminate accurate travel information to drivers. Millions of dollars go into data collection infrastructure to collect traffic congestion and travel time information on major freeways or highways. For example, a driver on the I-210 in the Lo
  • March 31, 2016
    OCTA seeks proposals from three teams for I-405 freeway project
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re