Skip to main content

ITS upgrade for George Washington Bridge

The electronic highway signage system and field devices that provide real-time travel information for the 300,000 daily users of New York’s George Washington Bridge are to undergo a major overhaul in a US$65.1 millio0n project. The Port Authority of New York has approved the project to replace the intelligent transportation system (ITS) which includes the upgrade and replacement of 11 existing variable message signs and the installation of seven new ones; the installation of a new overhead sign structure
June 29, 2015 Read time: 2 mins
The electronic highway signage system and field devices that provide real-time travel information for the 300,000 daily users of New York’s George Washington Bridge are to undergo a major overhaul in a US$65.1 million project.

The Port Authority of New York has approved the project to replace the intelligent transportation system (ITS) which includes the upgrade and replacement of 11 existing variable message signs and the installation of seven new ones; the installation of a new overhead sign structure; the upgrade and replacement of fixed message signs; the replacement of variable message signs, vehicle detectors, traffic cameras, travel time readers and a weather information station.

The bridge's ITS system feeds traffic data to TRANSCOM, a consortium that operates a regional traffic management system and provides information to all member agencies for radio reports, highway signs, traffic apps and other means of disseminating traffic information.

"Moving people and goods smoothly and safely through the region is our primary mission," said Port Authority chairman John Degnan. "Utilizing the latest technology to better manage traffic congestion at our bridges and tunnels plays an important part in that effort."

"The Port Authority's facilities are critical to moving people and goods throughout the region," said Port Authority vice chairman Scott Rechler. "Today's action to employ this intelligent transportation system will help move the 300,000 commuters that cross the world's busiest bridge everyday and reduce congestion throughout the region."

The project is due to begin in the fourth quarter of 2017 and be completed by the second quarter of 2020.

Related Content

  • ITS America applauds passing of FAST Act
    December 7, 2015
    The US House of Representatives has approved the Fixing America’s Surface Transportation (FAST) Act, five-year legislation to improve America’s roads, bridges, public transit, and rail transportation systems and reform federal surface transportation programs. Among the FAST Act provisions are: US$100 million per year for intelligent transportation systems (ITS) research; Creation of a new US$60 million per year Advanced Transportation and Congestion Management Technologies Deployment Program designed to
  • Syracuse models post-industrial revival for US cities
    August 13, 2015
    A connective corridor in Syracuse, New York State, could be a model for other post-industrial cities, as David Crawford discovers. The aim of the city of Syracuse’ 5.6km-long Connective Corridor in Onandaga County in upstate New York is to create a model ‘complete street’ for use in wider regeneration schemes. Key transport-sector components are traffic calming, high-quality transit with accessible passenger information, plus walkability and bike-friendliness.
  • ITSWC 2022: Cubic expands New England deal
    September 22, 2022
    Company's evolving relationship with New England Traffic Solutions adds footprint
  • McCann participates in M1 smart motorway scheme
    July 16, 2018
    Civil and electrical engineering firm McCann will help upgrade a 7.5 mile stretch of a major Midlands route as part of the M1 junction 23a – 25 smart motorway scheme. The project stems from an agreement with Highways England and is intended to reduce congestion and smooth the flow of traffic to improve travel times. Carl Lancaster, operations director for McCann, says: “The finished project will also help to minimise environmental impacts and maximise the capacity of the motorway while ensuring continued