Skip to main content

ITS upgrade for George Washington Bridge

The electronic highway signage system and field devices that provide real-time travel information for the 300,000 daily users of New York’s George Washington Bridge are to undergo a major overhaul in a US$65.1 millio0n project. The Port Authority of New York has approved the project to replace the intelligent transportation system (ITS) which includes the upgrade and replacement of 11 existing variable message signs and the installation of seven new ones; the installation of a new overhead sign structure
June 29, 2015 Read time: 2 mins
The electronic highway signage system and field devices that provide real-time travel information for the 300,000 daily users of New York’s George Washington Bridge are to undergo a major overhaul in a US$65.1 million project.

The Port Authority of New York has approved the project to replace the intelligent transportation system (ITS) which includes the upgrade and replacement of 11 existing variable message signs and the installation of seven new ones; the installation of a new overhead sign structure; the upgrade and replacement of fixed message signs; the replacement of variable message signs, vehicle detectors, traffic cameras, travel time readers and a weather information station.

The bridge's ITS system feeds traffic data to TRANSCOM, a consortium that operates a regional traffic management system and provides information to all member agencies for radio reports, highway signs, traffic apps and other means of disseminating traffic information.

"Moving people and goods smoothly and safely through the region is our primary mission," said Port Authority chairman John Degnan. "Utilizing the latest technology to better manage traffic congestion at our bridges and tunnels plays an important part in that effort."

"The Port Authority's facilities are critical to moving people and goods throughout the region," said Port Authority vice chairman Scott Rechler. "Today's action to employ this intelligent transportation system will help move the 300,000 commuters that cross the world's busiest bridge everyday and reduce congestion throughout the region."

The project is due to begin in the fourth quarter of 2017 and be completed by the second quarter of 2020.

Related Content

  • New Mersey crossing ends Halton’s congestion misery
    December 5, 2017
    Plagued by intolerable congestion but denied government funding for its solution, tiny Halton Borough Council relentlessly pursued its vision and achieved what many believed impossible. Halton may be a small local authority in north west England, but it had a big traffic problem. However, as the road, or more particularly the bridge, involved was not deemed a strategic route, central government would not commission or even fund a solution - a problem that many other local authorities will recognise.
  • The Asia-Pacific poses a multitude of ITS challenges
    May 30, 2014
    The Asia-Pacific ITS Forum and Exhibition in Auckland, New Zealand, provided a focus for the region’s ITS Associations. Mary Bell reports. In late April, ITS New Zealand hosted the 13th Asia-Pacific ITS Forum and Exhibition in Auckland. Around 350 delegates from 24 nations gathered to share and advance ITS applications on both strategic and technical levels and to discuss the differing and various challenges faced in the region.
  • Comprehensive communications combats tolling resistance
    May 19, 2017
    Toll road operator must provide clear, comprehensive and consistent communications to user groups and the local community long before the facility opens. When new tolled highway infrastructure is about to go into service, the construction, management and finance specialists who brought it into being are about ready for a well-deserved celebration. But for the communications and outreach team responsible for building public support for the project – for bringing drivers to the road, and keeping partners and
  • A fresh approach to electronic fee collection
    July 16, 2012
    The Utah Transit Authority (UTA) is pioneering fresh approaches to Electronic Fee Collection (EFC) deployment in the US. Its new system, operational since January 2009 on all buses and commuter trains, is the country's first full-network rollout of transit e-ticketing technology built on an open-payment network, according to the organisation's Technology Programme Development Manager Craig Roberts.