Skip to main content

Arizona DOT testing wrong-way vehicle detectors

The Arizona Department of Transportation (ADOT) is testing wrong-way vehicle detection devices next to off-ramps along Phoenix-area freeways as part of an ongoing research effort to reduce the risk of wrong-way crashes. Three detectors, manufactured by Tapco have been installed along the northbound Interstate 17 exit to State Route 74, the eastbound Interstate 10 exit at Ray Road and the northbound Loop 101 off-ramp at Thunderbird Road. Two other detection devices, manufactured by Wavetronix, were instal
August 13, 2015 Read time: 2 mins
The 6576 Arizona Department of Transportation (ADOT) is testing wrong-way vehicle detection devices next to off-ramps along Phoenix-area freeways as part of an ongoing research effort to reduce the risk of wrong-way crashes.

Three detectors, manufactured by 989 Tapco have been installed along the northbound Interstate 17 exit to State Route 74, the eastbound Interstate 10 exit at Ray Road and the northbound Loop 101 off-ramp at Thunderbird Road. Two other detection devices, manufactured by Wavetronix, were installed late last year along a pair of Loop 101 exit ramps in the West Valley.

The Tapco system includes radar and camera sensors designed to detect wrong-way vehicles on freeway exit ramps. When a vehicle is detected, the system activates blinking red LED lights on two ‘wrong way’ signs to try to warn the driver. During the testing stage, the system also is set up to send email messages with photos to notify ADOT staff and the Department of Public Safety that a wrong-way vehicle is detected.

The three locations where the system is being tested were selected based on previous research, including figures from the Department of Public Safety on 9-1-1 emergency calls reporting wrong-way vehicles.

The testing of these detectors is among several steps ADOT has taken in efforts to reduce the risk of crashes involving wrong-way drivers on state highways, including a study of wrong-way vehicle detection and warning systems, including a review of potential countermeasures.

Following a pilot project, more than 500 larger and lowered ‘wrong way’ and ‘do not enter’ signs have been installed along dozens of state highway off-ramps. In one project earlier this year, ADOT used approximately US$300,000 in available highway maintenance funding to manufacture and install larger signs, as well as pavement arrows, along approximately 90 off-ramps around the state.

For more information on companies in this article

Related Content

  • TRC launches smart mobility advanced research and test centre
    January 27, 2017
    The US state of Ohio and the Ohio State University are funding the US$45 million Phase 1 expansion of the Transportation Research Center's (TRC) new 540-acre SMART (Smart Mobility Advanced Research and Test) Center. To to be built within the 4,500 acres of the TRC’s independent automotive testing facility and proving grounds, SMART aims to be a hub for testing of automated and autonomous vehicles, designed to enable car manufacturers and suppliers to expand their testing. Phase 1 of the expansion will in
  • Canada looks to HOT lanes to tackle congestion
    March 16, 2017
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • Sernis sees through the fog
    March 29, 2022
    Fog can reduce drivers’ visibility to nearly nothing. However, if the Sernis SR-SDSFog system, nominated for an Intertraffic Green Globe Award, is activated in foggy situations, it uses LEDs for guidance and also to warn of the presence of another vehicle in front.
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b