Skip to main content

SmartMobility Road Suite for Saudi Arabia

Telvent GIT has been awarded a contract by Almabani General Contractors to implement the SmartMobility Road Suite solution on the extension of roads in Arriyadh Old Airport area. The project, led by the High Commission for the Development of Arriyadh, will extend the existing north-south and east-west highways for more than 11km including construction of three tunnels. Telvent’s SmartMobility Road Suite, based on the company’s control and data acquisition system (OASyS SCADA), will allow centralisation of
June 25, 2012 Read time: 1 min
134 Telvent GIT has been awarded a contract by Almabani General Contractors to implement the SmartMobility Road Suite solution on the extension of roads in Arriyadh Old Airport area. The project, led by the High Commission for the Development of Arriyadh, will extend the existing north-south and east-west highways for more than 11km including construction of three tunnels.

Telvent’s SmartMobility Road Suite, based on the company’s control and data acquisition system (OASyS SCADA), will allow centralisation of both tunnel infrastructure and traffic management providing operators with a set of effective tools to facilitate the process, while heightening safety and security. Fire detection control, CCTV surveillance, automatic incident detection, traffic data collection station, variable message panels, lighting, ventilation and associated communications network will be implemented and integrated.

Related Content

  • August 26, 2016
    Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • September 2, 2015
    Indra to upgrade Algeria’s Bouïra tunnel
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • April 23, 2012
    Telvent to expand RWIS for Alberta
    Telvent GIT has been selected to expand Alberta Transportation’s current road weather information and traffic monitoring systems. The project will build upon the success of the company’s original development and deployment of a comprehensive road weather information system (RWIS) that has contributed to improved road safety throughout the Canadian Province for the last six years.
  • July 3, 2017
    Indra technology manages the longest tunnel in south-east Asia
    Indra has installed its smart technology in the control centre of the Chenani road tunnel and has carried out the design, development, implementation and launch of the tunnel's management system, based on its proprietary Horus solution.