Skip to main content

Colombian highway sees ITS tested to the extreme

One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
November 13, 2014 Read time: 4 mins
A bride being constructed over the Quebrada Blanca will carry the road between tunnels 10 and 11 in section three of the new highway

One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio.

Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory. The road is the only economical way to join the eastern region of the country with Bogota, Colombia’s capital, and consequently it has the highest traffic growth in the country.

An upgrade to a segregated highway with two lanes in each direction has been planned by the National Roads Institute INVÍAS. However, the new road will have to run through 18 tunnels totalling almost 15km in length as well as across 50 bridges and viaducts with a total length of 5,228m. In some section the work is an upgrade to the existing roadway but most, including most the tunnels and bridges, is completely new green-field infrastructure.

Colombian concessionaire 7764 Coviandes Andes will manage the road and has awarded Spanish consultancy and technology firm 509 Indra a US$34m contract to design and install traffic management technology in 18 tunnels, 41 bridges and three overpasses along a particularly challenging 45km section. It is expected that more than 1,200 vehicles carrying hazardous goods (usually fuel) will use this stretch of the road each day, so the new tunnels are designed to the European EuroTAPstandards for maximum safety and efficiency. While three existing tunnels will be utilised the remaining tunnels and bridges are under construction or have been completed.

The contract also includes a new control centre at Naranjal which will house five operators and will be integrated with those at Boquerón and Buenavista to manage the traffic in the whole infrastructure. As with the existing control centres, the new one will be fitted with Indra’s Horus integrated roadway and tunnel management system which provides the operators with real-time information.

Monitoring and control systems in the tunnels are centred on 215 fixed CCTV/ machine vision cameras which detect incidents, stationary vehicles or obstacles, wrong way drivers and pedestrians. There are also individual detectors for visibility, fire and carbon monoxide. SOS posts along with communications including loudspeakers and road signage are available should an incident occur. All the tunnels will also be equipped with power generators and backup power, a lighting system and emergency evacuation routes.

Coviandes has also specified automatic incident detection systems along the full 86km between Bogota and Villavicencio including 72 pan and tilt cameras and a fourth weather station added to the three that are already deployed. There will be also variable message signs along the roadway to provide drivers with real-time information about road conditions, speed limits and incidents.

In normal operation Boquerón will remain the lead control room with the other two acting as monitors. However, all three control centres can share the control of the road and each is equipped to manage the entire road and take the lead in the event of an incident. This includes a complex radio communication system based on the transmission of the digital mobile radio signals from three mountains joined by a radio link that covers the entire length of the road.

In the event of an incident both single lane running and contraflow arrangements can be quickly implemented using either the VMS or a combination of VMS and cones. The design of the new road is such that in some sections it runs parallel to the existing road so there will be seven sections where traffic can be diverted onto and off of the old road in the event of a major incident. 

While the first section will be opened this December, it will be until July 2017 before the highway is finished and once completed it will cut the journey to about 90 minutes and reduce vehicle operating costs by up to 60%. 

For more information on companies in this article

Related Content

  • ETC Corporation awarded $88 million tolling contract
    March 23, 2012
    The Port Authority of New York and New Jersey has awarded a contract, valued at approximately $88 million, to Electronic Transaction Consultants Corporation (ETC Corporation) to provide a facility-wide replacement toll collection and audit system as well as related system maintenance services. Under the contract, ETC will implement its latest generation Rite solution on the Port Authority’s toll facilities to deliver a number of advanced system features including a sophisticated toll data warehouse, an adva
  • Joining old and new in Canada’s Highway 407
    June 17, 2016
    David Arminas visits Canada’s Highway 407 ETR to see how the concession is working and hear about new arrangements for the roadway’s extension. The Toronto region is North America’s eighth largest metropolitan area and its roads become notoriously congested. In 1997 Highway 407, a 68km concrete toll motorway which skirts the northern edge of Toronto, was opened and initially operated by the province and CHIC - a consortium of four leading Ontario-based companies. Finance came from the Ontario Financing Auth
  • Bogotá’s affordable path to safer roads
    April 28, 2022
    Enforcing speed limits on key corridors is a cost-effective way of reducing collisions in the Colombian capital, say the authors of a new study. Andrew Stone talks to them
  • Kapsch TrafficCom to upgrade Massachusetts ITMS
    June 28, 2016
    Kapsch TrafficCom North America has secured a four year, US$11.5 million (€10.4 million) contract to upgrade and modernise the integrated transportation management system (ITMS) at the Highway Operations Center (HOC) of the Massachusetts Department of Transportation (MassDOT). The new system will manage all of the Department’s state-wide roadway network and the Boston Metropolitan Highway System tunnel complex and facilities. The next generation ITMS, based on Kapsch’s DYNAC software suite, will efficien