Skip to main content

California’s new tunnel has safety features inspired by deadly fire

A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.
November 1, 2013 Read time: 2 mins
A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.

There were no traffic lights, emergency gates, or message signs to warn motorists of the fire inside, caused when a gasoline tanker burst into flames. The lessons learned from that have inspired the many safety features built into the new US$417 million fourth bore.

Some improvements have already been added to the First three tunnels, including surveillance cameras, variable message signs and external warning signs, and unlike the original two bores, the third and fourth bores will be connected by seven escape passages.

Traffic lights and a traffic gate that swings shut in emergencies have also been added to the third and fourth bores.

Fire and safety systems installed in the new bore include state-of-the-art fire detection and suppression systems. TOS and SCADA (Supervisory Control And Data Acquisition) systems will provide specially-trained operators with real-time information and management capabilities for the four tunnels’ traffic, fire detection, power supply, ventilation and lighting systems. These systems allow trained professionals at the new operations and maintenance control centre to monitor and respond to threats inside the tunnel, including detecting and suppressing fires and other hazards, and providing real-time information to help motorists safely exit in an emergency.

The project, which will bring congestion relief in the off-peak direction to commuters between Alameda and Contra Costa counties, is a partnership between (Caltrans), the Contra Costa Transportation Authority, the Alameda County Transportation Commission and the 343 Metropolitan Transportation Commission.

For more information on companies in this article

Related Content

  • Vehicle probe data aids emergency rescue vehicle routing
    June 20, 2012
    A new vehicle routeing initiative has arisen to help improve emergency response and relief following natural disasters in Japan. David Crawford reports Japan’s national ITS group ITS Japan and the country’s leading automotives have agreed on a new combined approach to the organisation of traffic management and emergency response in the wake of major natural disasters. A new, robust traffic information platform using probe data obtained from vehicles to support traffic flow will build on the shared experienc
  • Caltrans sends clear message on Swarco McCain CMS
    April 25, 2023
    Swarco McCain is highlighting that the California Department of Transportation (Caltrans) has renewed their partnership for the supply of industry standard-setting changeable message signs (CMS).
  • Plug and play approach unifies workzone ITS
    July 18, 2012
    Caltrans District 7 is finalising a ConOps document which will detail a plug-and-play to work zone ITS operation. The organisation's Allen Z. Chen elaborates. Before August is out, on current planning, the California Department of Transportation (Caltrans) District 7 (which covers Los Angeles and Ventura Counties, with a combined population of close to 11 million people) intends to have finalised a Concept of Operations (ConOps) document dealing with Work Zone Transportation Management Systems (WZTMS). The
  • Norway to renovate 200 tunnels
    August 12, 2013
    The Norwegian Public Roads Administration (Statens Vegvesen) has to renovate 200 tunnels before 1 April 2019 to meet European Union safety requirements for tunnels. Norway’s Tunnel Safety Regulations 2007 apply to tunnels on state roads that are more than 500 metres long, of which Norway has 253. Thirty of these were built after 2007 and comply with the regulations, while only around twenty tunnels built after 2007 have been renovated. The authority will present an action program for the 2014-2017 period