Skip to main content

California’s new tunnel has safety features inspired by deadly fire

A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.
November 1, 2013 Read time: 2 mins
A fire in the third-bore of the Caldecott tunnel that killed seven in 1982 led to changes to standards for new tunnels, including the new fourth bore which is due to open later this month.

There were no traffic lights, emergency gates, or message signs to warn motorists of the fire inside, caused when a gasoline tanker burst into flames. The lessons learned from that have inspired the many safety features built into the new US$417 million fourth bore.

Some improvements have already been added to the First three tunnels, including surveillance cameras, variable message signs and external warning signs, and unlike the original two bores, the third and fourth bores will be connected by seven escape passages.

Traffic lights and a traffic gate that swings shut in emergencies have also been added to the third and fourth bores.

Fire and safety systems installed in the new bore include state-of-the-art fire detection and suppression systems. TOS and SCADA (Supervisory Control And Data Acquisition) systems will provide specially-trained operators with real-time information and management capabilities for the four tunnels’ traffic, fire detection, power supply, ventilation and lighting systems. These systems allow trained professionals at the new operations and maintenance control centre to monitor and respond to threats inside the tunnel, including detecting and suppressing fires and other hazards, and providing real-time information to help motorists safely exit in an emergency.

The project, which will bring congestion relief in the off-peak direction to commuters between Alameda and Contra Costa counties, is a partnership between (Caltrans), the Contra Costa Transportation Authority, the Alameda County Transportation Commission and the 343 Metropolitan Transportation Commission.

For more information on companies in this article

Related Content

  • Indra technology manages the longest tunnel in south-east Asia
    July 3, 2017
    Indra has installed its smart technology in the control centre of the Chenani road tunnel and has carried out the design, development, implementation and launch of the tunnel's management system, based on its proprietary Horus solution.
  • Danish tunnel gets Afry ITS system
    September 28, 2022
    Project is designed to reduce heavy goods vehicle traffic in centre of Copenhagen
  • Gotthard Base Tunnel opens in Switzerland
    June 1, 2016
    After 17 years of construction, the 57 kilometre-long Gotthard Base Tunnel in Switzerland, said to be the longest train tunnel in the world opens today, 1 June. At a depth inside the Gotthard massif of more than 2,000 metres, trains will travel at up to a maximum 250 kilometres per hour. The opening is attracting attention from high profile figures outside of Switzerland, including Germany’s chancellor Angela Merkel, French president François Hollande and Italian Prime Minister Matteo Renzi, who will al
  • Improving safety at Mersey Tunnel
    April 19, 2012
    Consultant Parsons Brinckerhoff will upgrade the fire fighting systems in the Mersey Tunnel in the UK. This move will improve the tunnel’s safety measures and bring it into line with stringent new requirements being introduced right across Europe. Under the terms of the deal international consultant Parsons Brinckerhoff has a contract to help Merseyside Integrated Transport Authority upgrade and modernise fire fighting systems in the Kingsway tunnels, which are two of the longest road tunnels in the UK. The