Skip to main content

TransCore to upgrade Delaware River bridge toll system

The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
October 1, 2015 Read time: 3 mins
The 794 Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded 139 TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure.

The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.

According to DRJTBC the project will replace the Commission’s rapidly aging toll-collection infrastructure with the latest equipment and technology. The replacement system will then be maintained for an extended period under the same contract.

The project will be broken into two phases. The first phase will involve the design, development, integration, installation and testing of a collection system to handle cash and electronic transactions at the Commission’s seven toll bridges.

This work also will extend to the establishment of an all-electronic tolling system at a future eighth toll bridge, the Scudder Falls Replacement Bridge, the first span of which is expected to become operational in 2019. The new, improved system also will include integration with host computers at the New Jersey Regional Customer Service Center for E-ZPass, which currently provides back-office support and violation enforcement for the Commission’s toll network.

The second phase will involve the maintenance of all the newly installed equipment and operating systems for five years with two additional three-year options. It also will cover the maintenance of existing toll plaza equipment such as LED signage, lane signal indicators and yellow beacons.

Optional work under the contract may include the installation of a toll-collector monitoring system at the Commission’s seven current toll bridges and the installation of self-service kiosks at the agency’s three low-volume toll plazas, at the New Hope-Lambertville, Portland-Columbia and Milford-Montague toll bridges.

A significant aspect of the project will involve the installations of next-generation electronic toll tag readers, enabling the Commission to read toll transponder readers from non-E-ZPass toll agencies once national interoperability is decided and implemented.

Among the anticipated system-wide hardware improvements are: Overhead LED scanners to improve vehicle profiling for toll‐classification purposes; New patron fare displays in the toll lanes; Electronic axle-counting loops in toll lane pavements, enabling removal of current-day mechanical treadles that are expensive to maintain; New violation enforcement cameras for taking front and rear images of vehicles when they pass through a toll lane; New terminals in toll booths, allowing toll collectors to better handle cash transactions; New flash units for enhancing vehicular images recorded by toll violation cameras; and a new digital video system for auditing all toll transactions.

The first phase of modernisation activities is expected to be completed in 16 months, with equipment installation and toll lane conversion work beginning in summer 2016 and ending before the onset of winter. Subsequent maintenance and operation services under the contract are for five years with two three-year options.

To keep the current toll collection system running until the new modernised network comes online in late 2016, the Commission approved two additional contracts: A one-year agreement with 4186 Xerox for maintaining current system hardware and the software for open‐road tolling and violation enforcement; and a one year agreement with TransCore to provide maintenance and support for the software that ties the Commission’s conventional toll system together with computer servers at its respective bridges and the servers at the regional customer service/violations processing centre in Newark, New Jersey.

For more information on companies in this article

Related Content

  • Port authority to replace ITS system at George Washington bridge
    November 16, 2012
    The Intelligent Transportation System (ITS) at the George Washington Bridge (GWB), first installed in 1997, is to be replaced by the Port Authority of New York and New Jersey as part of a road improvements being planned throughout the region. The ITS provides information on traffic conditions, estimated travel times, and lane restrictions to motorists via electronic signs on roads leading to the GWB. An estimated 101 million vehicles crossed the world’s busiest crossing in both directions in 2011. Work on t
  • US adopts automated enforcement… gradually
    March 4, 2014
    The US automated enforcement market is in rude health as the number of systems and applications continues to grow and broaden. Jason Barnes reports. Blessed and cursed – arguably, in equal measure – with a constitution which stresses the right to self-expression and determination, the US has had a harder journey than most to the more widespread use of automated traffic enforcement systems. In some cases, opposition to the concept has been extreme – including the murder of a roadside civil enforcement offici
  • Q-Free tolling system for Sydney Harbour Bridge
    September 26, 2012
    Norwegian headquartered Q-Free, supplier of road user charging solutions and advanced transportation management systems, has been awarded a contract by Roads and Maritime Services (RMS) in Australia for the design, supply and installation of an electronic tolling system for the iconic Sydney Harbour Bridge. The contract, worth US$5.7 million with additional options worth approximately US$2.9 million, comprises the supply and delivery of a roadside system, based on the company’s unique single gantry tolling
  • PPP helps speed Chicago’s transit fare upgrade
    December 15, 2014
    David Crawford on a fast-tracked payment upgrade. This July saw the completion of the final stage of the implementation of Chicago’s new Ventra open fare payment system on the services of two of the region’s three transit providers, the Chicago Transit Authority (CTA) and regional bus operator Pace. Ventra has been introduced to accept any contactless general purpose payment card, including personal debit and credit cards.