Skip to main content

TransCore to upgrade Delaware River bridge toll system

The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
October 1, 2015 Read time: 3 mins
The 794 Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded 139 TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure.

The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.

According to DRJTBC the project will replace the Commission’s rapidly aging toll-collection infrastructure with the latest equipment and technology. The replacement system will then be maintained for an extended period under the same contract.

The project will be broken into two phases. The first phase will involve the design, development, integration, installation and testing of a collection system to handle cash and electronic transactions at the Commission’s seven toll bridges.

This work also will extend to the establishment of an all-electronic tolling system at a future eighth toll bridge, the Scudder Falls Replacement Bridge, the first span of which is expected to become operational in 2019. The new, improved system also will include integration with host computers at the New Jersey Regional Customer Service Center for E-ZPass, which currently provides back-office support and violation enforcement for the Commission’s toll network.

The second phase will involve the maintenance of all the newly installed equipment and operating systems for five years with two additional three-year options. It also will cover the maintenance of existing toll plaza equipment such as LED signage, lane signal indicators and yellow beacons.

Optional work under the contract may include the installation of a toll-collector monitoring system at the Commission’s seven current toll bridges and the installation of self-service kiosks at the agency’s three low-volume toll plazas, at the New Hope-Lambertville, Portland-Columbia and Milford-Montague toll bridges.

A significant aspect of the project will involve the installations of next-generation electronic toll tag readers, enabling the Commission to read toll transponder readers from non-E-ZPass toll agencies once national interoperability is decided and implemented.

Among the anticipated system-wide hardware improvements are: Overhead LED scanners to improve vehicle profiling for toll‐classification purposes; New patron fare displays in the toll lanes; Electronic axle-counting loops in toll lane pavements, enabling removal of current-day mechanical treadles that are expensive to maintain; New violation enforcement cameras for taking front and rear images of vehicles when they pass through a toll lane; New terminals in toll booths, allowing toll collectors to better handle cash transactions; New flash units for enhancing vehicular images recorded by toll violation cameras; and a new digital video system for auditing all toll transactions.

The first phase of modernisation activities is expected to be completed in 16 months, with equipment installation and toll lane conversion work beginning in summer 2016 and ending before the onset of winter. Subsequent maintenance and operation services under the contract are for five years with two three-year options.

To keep the current toll collection system running until the new modernised network comes online in late 2016, the Commission approved two additional contracts: A one-year agreement with 4186 Xerox for maintaining current system hardware and the software for open‐road tolling and violation enforcement; and a one year agreement with TransCore to provide maintenance and support for the software that ties the Commission’s conventional toll system together with computer servers at its respective bridges and the servers at the regional customer service/violations processing centre in Newark, New Jersey.

For more information on companies in this article

Related Content

  • Chile opts for Q-Free’s free flow tolling
    August 25, 2015
    Q-Free is to supply its single gantry multi lane free flow tolling system to Sociedad Concesionaria Vespucio Norte Express, Chile. The order, valued at around US$4 million, is for the design and installation of the renewal of an existing electronic toll collection system in Santiago and includes an initial three-year service and maintenance period, which the customer has the option to renew for a further seven years. Delivery is due to be completed by the end of 2017. “We are pleased to receive this o
  • Scania to test electric trucks and buses in real-life conditions
    June 9, 2015
    In February 2016, Scania will begin testing electric trucks as part of the Swedish Gävle Electric Road project, which will demonstrate and evaluate conductive technology, using electric transmission through overhead lines above vehicles equipped with a pantograph power collector. The Swedish Transport Administration has now approved support for the project, which is in line with the Government’s goal of an energy-efficient and fossil-free vehicle fleet by 2030. The project consists of about US$9.2 millio
  • Machine vision offers new solutions to old problems
    October 28, 2014
    The transportation sector is set to benefit from a far wider range of machine vision technology. While machine vision techniques have been applied to traffic management applications for some years, in some areas there can still be a shortage of knowledge about what the technology can offer transportation professionals. The image processing and interpretation functions of machine vision enables control room staff to be immediately alerted to occurrences requiring attention which, in turn, enables each person
  • TransCore and New York City DOT win prestigious IRF award
    January 16, 2013
    TransCore and the New York City Department of Transportation have been presented with the prestigious International Road Federation (IRF) Global Road Achievement Award (GRAA) for deployment of the midtown in motion adaptive signal control system. The GRAA is a leading international competition to identify and honour excellence, innovation, and exceptional achievement. This year’s awards honoured ten projects from countries around the world, with NYCDOT and TransCore receiving the award for excellence in int