Skip to main content

Siemens launches wireless outstation monitoring

Siemens’ new 3G wireless communications solution allows the company’s outstation monitoring units (OMUs) to be connected to its remote monitoring and control system (RMS) instation enabling new and existing installations to use 3G communications without the need for wired or fibre links. The solution reduces installation and civil engineering costs and is available to upgrade existing Gemini 2 OMUs while for Gemini 1 units the company offers an upgrade solution to Gemini 2. The 3G communications option (for
March 17, 2015 Read time: 1 min
RSS189 Siemens’ new 3G wireless communications solution allows the company’s outstation monitoring units (OMUs) to be connected to its remote monitoring and control system (RMS) instation enabling new and existing installations to use 3G communications without the need for wired or fibre links.

The solution reduces installation and civil engineering costs and is available to upgrade existing Gemini 2 OMUs while for Gemini 1 units the company offers an upgrade solution to Gemini 2. The 3G communications option (for an approved 3G router) is then adding along with antenna kit.

For more information on companies in this article

Related Content

  • New report addresses ITS dependence on M2M communications
    June 10, 2013
    A new report from Research and Markets, M2M Communications and Intelligent Transportation Systems - Markets, Standardisation, Technologies, addresses a relatively new trend in the Intelligent Transportation Systems (ITS) development - its dependence on the progress in machine to machine (M2M) communications. The report concentrates on specifics of M2M communications and the necessity to design communications technologies that agree with M2M specifics. The M2M industry, standardisation, specifics and markets
  • Siemens to modernise metro line in Peru
    January 4, 2017
    Siemens is to provide the complete traction power supply for the first section of metro line 1 in Lima, which covers around nine kilometres. The modern power supply, upgrading of existing overhead contact line system and modifications to electrification in the depots will increase both the availability and the cost-effectiveness of the rail route. The upgrade will be carried out during ongoing operation. Lima's first metro line was completed in 2011, covering around 21 kilometres. The line connects the s
  • SES America’s SolarSign wins new product award
    September 9, 2014
    SES America arrives at World Congress fresh from the National Rural ITS conference where its SolarSign was awarded New Product of the Year. SolarSign is a solar powered Dynamic Messaging Sign (DMS) system with full range capabilities for large scale displays on major highways in both rural and urban locations. The solar power system allows signs to be erected where needed without placement being dictated by access to power and the signs can display travel times, warnings and awareness signs.
  • Indra and Siemens team up on railway signalling
    April 19, 2012
    Leading Spanish IT company, Indra and Siemens have signed an agreement to develop a new thorough railway signalling solution which comprises traditional signalling and the ERTMS level 2 technology for the future European railway traffic management system. The agreement includes commercialisation of the platform by both companies at national and international level.