Skip to main content

Reno A&E introduces signal monitor recertification program

Reno A&E (RAE) has introduced a new signal monitor recertification program RAE signal monitor less than 12 years old. This provides hardware and firmware updates, minor repairs, test report and a certificate of recertification along with a new factory two-year warranty and warranty label.
June 8, 2016 Read time: 1 min

7435 Reno A&E (RAE) has introduced a new signal monitor recertification program RAE signal monitor less than 12 years old. This provides hardware and firmware updates, minor repairs, test report and a certificate of recertification along with a new factory two-year warranty and warranty label.

RAE said its signal monitors should be periodically tested to ensure safety.  The recertification program was developed to help agencies quickly, easily and cost-effectively perform the testing and helps establish effective and proactive maintenance strategies.

All signal monitors returned for recertification will be dealt with on a quick turnaround basis (to get units back in service as quickly as possible) and will be subjected to full factory testing.

For more information on companies in this article

Related Content

  • The FIA’s formula for future mobility
    March 11, 2016
    The FIA’s Region I president Thierry Willemarck tells Colin Sowman about his organisation’s campaigning work for the rights of road users and mobility for all. The Fédération Internationale de l’Automobile may be best known as the FIA and the governing body for world motor sport - particularly Formula 1 - but its influence spreads far wider than the racetrack. The organisation was founded in 1904 with a remit to safeguard the rights and promote the interests of motorists and motor sport across the world. No
  • Opening the closed-loop to realise ITS benefits
    April 8, 2014
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency
  • Rapid growth of bus rapid transit schemes on US Pacific coast
    January 27, 2012
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals