Skip to main content

New Linux servers with ArcGIS Server 10

Cutting Edge Networked Storage and Esri have announced new Linux server solutions with ArcGIS Server Enterprise 10 pre-installed.
February 6, 2012 Read time: 1 min
1036 Cutting Edge Networked Storage and 50 ESRI have announced new Linux server solutions with ArcGIS Server Enterprise 10 pre-installed. Esri has selected Cutting Edge to manufacture and deliver the new Linux servers with ArcGIS Server 10 based on the popular Redhat Enterprise operating system to its customer base.

For more information on companies in this article

Related Content

  • Huawei opens door to new opportunities in transport & logistics
    December 18, 2024
    By addressing the four key elements of a transportation network’s composition with a state-of-the-art digital solution, Huawei is bringing significant performance uplifts to all aspects of railway operations
  • Cubic and MTA win ITS-New York Project of the Year
    June 17, 2014
    Cubic Transportation Systems and the New York Metropolitan Transportation Authority (MTA) have been awarded the ITS-New York Project of the Year for MTA Bus Time, the customer information system for bus location and arrival times that was developed for the MTA. Bus Time was completed in March and covers more than 15,000 bus stops in New York City. Under a contract awarded in 2013, Cubic was selected to build and integrate the bus hardware system that includes the on-board computer and bus location device
  • Top 5 trends in vision technology
    June 24, 2021
    Artificial intelligence and deep learning algorithms are among the major trends having an impact on road traffic enforcement, according to leading companies in the vision sector
  • Netherlands to get nationwide network of EV fast-charging stations
    July 8, 2013
    By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station. Power and automation technology company ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands. Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways. The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra