Skip to main content

Moxa advanced Modbus gateways

Moxa had introduced the MGate MB3000 series of Modbus gateways which feature auto-calibration of response timeout, smart routing, support for multiple TCP masters, and a utility that supports multiple languages.
March 12, 2012 Read time: 1 min
97 Moxa had introduced the MGate MB3000 series of Modbus gateways which feature auto-calibration of response timeout, smart routing, support for multiple TCP masters, and a utility that supports multiple languages. Models will feature a priority control function that allows special or critical requests to bypass the strict, first-come, first-served communication structure of Modbus. Users may assign first priority to specific requests, port numbers, or IP addresses, giving integrators valuable flexibility in handling a system's requirements. The advanced models will also feature a serial redirector function, which enables data transmission between device ports. This allows the original serial master to continue controlling slaves on another device port while monitoring is performed from the TCP network. Modbus RTU/ASCII systems can now add Modbus TCP monitoring and control without disrupting the original system architecture.

The basic models in the MGate MB3000 series have an MB3x80 designation while advanced models have an MB3x70 designation.

For more information on companies in this article

Related Content

  • Winsted: ‘Minimise distraction – maximise focus’
    June 13, 2022
    Traffic management is a physically and mentally demanding job – so select transportation control room furniture that provides bumper-to-bumper productivity, says Randy Smith of Winsted
  • Progress of ICT transport research projects
    February 3, 2012
    Juhani Jääskeläinen, head of the ICT for Transport Unit, DG Information Society and Media, European Commission, details the results of Call 4 for research projects in ICT for transport. Since the closure of the call and evaluation process during the summer of last year the European Commission (EC) has been negotiating and signing contracts with projects which were selected from proposals submitted to Call 4 of the 7th Framework Programme (FP7) in the area of Information and Communication Technology (ICT) fo
  • Evolving Australia's truck weighing programme
    March 1, 2013
    Regulating heavy truck weight isn’t all about sensors in the road… this year marks a significant point in the progression of Australia’s Intelligent Access Programme as its administrators attempt to answer the scheme’s critics. Jon Masters reports. Australia’s Intelligent Access Programme (IAP), the country’s telematics-based system of reg­ulating movement of the heaviest vehicles, is now five years old. The IAP is administered by Transport Certification Australia (TCA) whose general manager for strategic d
  • GIS mapping smoothes ITS operations and increases efficiencies
    January 30, 2012
    Alexander Gerschenkron, the famous economic historian, once posited a benefit for those countries which come late to economic development: that they could introduce the latest technology and thus jump over some of the standard development paths followed by their predecessors . It is entirely possible to make the same observation of late-comers to ITS: that they can gain from the pains of those who went before and more easily implement best practice in ITS. As a consequence, it is entirely likely the Abu Dha