Skip to main content

Conference delegates to visit dual-purpose tunnel

Delegates to the ITS AP Forum will have an opportunity to visit Kuala Lumpur’s Stormwater Management & Road Tunnel (SMART), a unique solution to the Malaysian capital’s long-term traffic and stormwater management problems – the first tunnel of its kind in the world.
March 15, 2012 Read time: 2 mins
Delegates to the ITS AP Forum will have an opportunity to visit Kuala Lumpur’s Stormwater Management & Road Tunnel (SMART), a unique solution to the Malaysian capital’s long-term traffic and stormwater management problems – the first tunnel of its kind in the world. The dual-purpose tunnel can divert floodwaters away from the confluence of two major rivers running through the city centre, while its central section doubles up as a twin deck motorway to relieve traffic congestion at the main southern gateway into the city centre.

SMART, which cost some US$515M and opened to traffic in May 2007, comprises 9.5km of tunnel with the central 3km incorporating the double deck motorway. There are three modes of operation:
Mode one operates under normal conditions when low rainfall means that no water needs to be diverted into the tunnel. Moderate storms activate mode two, when floodwater is channelled into a bypass tunnel in the lower section of the motorway tunnel, enabling it to remain open to traffic; during the once or twice yearly heavy Monsoon storms a switch is made to mode three when the tunnel is closed to road traffic and the full tunnel section, with a combined capacity of three million cubic metres, becomes available to divert the dramatically increased flows of water.

Related Content

  • Strategic road deals across India
    April 17, 2012
    A series of key highway projects will help transform India’s internal links as well as its connections to neighbouring nations. A new US$1.2 billion highway in India running through Ahmedabad-Udaipur-Kishangarh through the states of Gujarat and Rajasthan is attracting strong interest. So far 11 bids have been made including offers from a consortium comprising Belford-GVK, Soma-Isolux, Vince-Hindustan Construction, IRB Infrastructure (IRB)-Reliance Infra and Plus-Nagarjuna Construction. Other bidders include
  • Proposed system to take guesswork out of choosing a freeway lane
    March 17, 2014
    A fledgling advanced lane management assist system can take the guesswork out of selecting the right lane on a congested freeway, as its inventor Robert Gordon explains. As drivers we’ve all done it and control room staff see it all the time – motorists on congested freeways switching into what they perceive is a faster lane, only to come to a halt a few moments later and watch vehicles in the other lanes continue to move past. Now, by re-analysing readily available data in an advanced lane management as
  • Luton to Dunstable guided busway opens
    September 25, 2013
    Following many years of planning, the Luton and Dunstable guided busway is now open to the public. The US$146 million project will provide a reliable and efficient 15 minute public transport link between the two main town centres. Overall, the route involves over 10 kilometres of segregated bus-only road from Luton Airport through Dunstable to Houghton Regis in Bedfordshire.
  • Plug and play approach unifies workzone ITS
    July 18, 2012
    Caltrans District 7 is finalising a ConOps document which will detail a plug-and-play to work zone ITS operation. The organisation's Allen Z. Chen elaborates. Before August is out, on current planning, the California Department of Transportation (Caltrans) District 7 (which covers Los Angeles and Ventura Counties, with a combined population of close to 11 million people) intends to have finalised a Concept of Operations (ConOps) document dealing with Work Zone Transportation Management Systems (WZTMS). The