Skip to main content

Conference delegates to visit dual-purpose tunnel

Delegates to the ITS AP Forum will have an opportunity to visit Kuala Lumpur’s Stormwater Management & Road Tunnel (SMART), a unique solution to the Malaysian capital’s long-term traffic and stormwater management problems – the first tunnel of its kind in the world.
March 15, 2012 Read time: 2 mins
Delegates to the ITS AP Forum will have an opportunity to visit Kuala Lumpur’s Stormwater Management & Road Tunnel (SMART), a unique solution to the Malaysian capital’s long-term traffic and stormwater management problems – the first tunnel of its kind in the world. The dual-purpose tunnel can divert floodwaters away from the confluence of two major rivers running through the city centre, while its central section doubles up as a twin deck motorway to relieve traffic congestion at the main southern gateway into the city centre.

SMART, which cost some US$515M and opened to traffic in May 2007, comprises 9.5km of tunnel with the central 3km incorporating the double deck motorway. There are three modes of operation:
Mode one operates under normal conditions when low rainfall means that no water needs to be diverted into the tunnel. Moderate storms activate mode two, when floodwater is channelled into a bypass tunnel in the lower section of the motorway tunnel, enabling it to remain open to traffic; during the once or twice yearly heavy Monsoon storms a switch is made to mode three when the tunnel is closed to road traffic and the full tunnel section, with a combined capacity of three million cubic metres, becomes available to divert the dramatically increased flows of water.

Related Content

  • How digital navigation is key to managing congestion
    March 24, 2023
    Satnav – not costly civil engineering projects – might point us towards better management of congested road networks, argues David Metz of University College London
  • Flir expands Marseille’s tunnel vision
    November 12, 2014
    Marseille’s city authority has added the monitoring of a second tunnel to the existing network with a new approach towards video management. Measuring 1.5km in length, the double-deck Prado Sud tunnel extends Marseille’s existing 2.5km Prado Carénage tunnel towards the southern part of the city. While it was logical to use a common control room and to use the latest detection and monitoring systems in the new tunnel, it was deemed too disruptive and costly to completely upgrade the existing tunnel.
  • Running on empty
    May 2, 2018
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly