Skip to main content

WSP/Parsons Brinckerhoff named general engineering consultant for US road extension

The Washington State Department of Transportation (WSDOT) has awarded a contract to WSP/Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma. The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near
July 29, 2016 Read time: 2 mins
The 451 Washington State Department of Transportation (WSDOT) has awarded a contract to 6666 WSP/4983 Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma.

The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near the Port of Tacoma. Five interchanges are planned.

WSP/Parsons Brinckerhoff will manage the consultant and sub-consultant team and design efforts in the following disciplines: roadway, hydraulics, stream realignment and riparian restoration, structures, geotechnical, wetland mitigation, utility relocation, traffic analysis, maintenance of traffic, illumination, signals, tolling and intelligent transportation systems. The firm will also assist with environmental permitting, local agency coordination in support of agreements, design support in the preparation of design-build or design-bid-build contract packages, and subsequent design support in review of the design submittals.

Construction on the extension is expected to start in 2019.

For more information on companies in this article

Related Content

  • Good news for the ITS industry from new $105 billion US transportation reauthorisation bill
    July 11, 2012
    ITS America has applauded approval by the US House of Representatives and the US Senate of the conference report to HR 4348, (here’s the link Joseph: http://www.rules.house.gov/Media/file/PDF_112_2/LegislativeText/CRPT-112hrpt-HR4348ih.pdf ) a legislative package which includes the surface transportation reauthoriSation bill. The bill passed the House by a wide margin of 373 – 52, was subsequently approved by the Senate by a 74-19 vote, and the legislation has been signed by the President. The legislation w
  • San Francisco Bay Area transit systems extend Cubic operations contract
    August 1, 2017
    Cubic Transportation Systems (CTS) has been awarded a contract extension of up to five years from the Metropolitan Transportation Commission (MTC) for operations and maintenance services supporting the regional Clipper card fare payment system in the San Francisco Bay Area. The extended contract period is from November 2019 to November 2024 and is valued at approximately US$25 million per year. MTC is the transportation planning, financing and coordinating agency for the nine-county San Francisco Bay Area.
  • Mario Cuomo Bridge: an ITS hotbed
    January 4, 2021
    The 3.1-mile Governor Mario M. Cuomo Bridge over the Hudson River in New York State is not just a massive engineering project – it is an ITS hotbed too. Phil Riggio of HDR tells Adam Hill why
  • IBTTA: industry must commit to trust and accountability
    August 23, 2018
    Without a commitment to trust and accountability, the modern road tolling industry would not have the bedrock which it requires – and which customers demand, says IBTTA’s Bill Cramer When Tim Stewart, executive director of Colorado’s E-470 Public Highway Authority, settled on ‘trust and accountability’ as the themes for his year as IBTTA president, it was a very deliberate choice. Stewart was looking for language that would help deliver the global tolling industry’s message of service excellence to cust