Skip to main content

WSP/Parsons Brinckerhoff named general engineering consultant for US road extension

The Washington State Department of Transportation (WSDOT) has awarded a contract to WSP/Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma. The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near
July 29, 2016 Read time: 2 mins
The 451 Washington State Department of Transportation (WSDOT) has awarded a contract to 6666 WSP/4983 Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma.

The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near the Port of Tacoma. Five interchanges are planned.

WSP/Parsons Brinckerhoff will manage the consultant and sub-consultant team and design efforts in the following disciplines: roadway, hydraulics, stream realignment and riparian restoration, structures, geotechnical, wetland mitigation, utility relocation, traffic analysis, maintenance of traffic, illumination, signals, tolling and intelligent transportation systems. The firm will also assist with environmental permitting, local agency coordination in support of agreements, design support in the preparation of design-build or design-bid-build contract packages, and subsequent design support in review of the design submittals.

Construction on the extension is expected to start in 2019.
UTC

Related Content

  • June 2, 2016
    Michigan DOT awards WSP/Parsons Brinckerhoff CV contracts
    The Michigan Department of Transportation (MDOT) has awarded two contracts to WSP/ Parsons Brinckerhoff for the development of connected vehicle initiatives throughout the state. The company will act as on-call consultant for MDOT’s state-wide connected vehicle program for a period of three years, providing such services as planning and strategy development, design and deployment of foundational system elements, public outreach and progress reporting and development of industry partnerships. In additi
  • February 14, 2014
    Parsons Brinckerhoff to provide quality control for Cleveland bridge
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
  • November 24, 2014
    Parsons Brinckerhoff to evaluate Babylon transportation
    Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.
  • July 4, 2014
    Parsons Brinckerhoff to modernise Michigan freeway
    Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin