Skip to main content

WSP/Parsons Brinckerhoff named general engineering consultant for US road extension

The Washington State Department of Transportation (WSDOT) has awarded a contract to WSP/Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma. The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near
July 29, 2016 Read time: 2 mins
The 451 Washington State Department of Transportation (WSDOT) has awarded a contract to 6666 WSP/4983 Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma.

The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near the Port of Tacoma. Five interchanges are planned.

WSP/Parsons Brinckerhoff will manage the consultant and sub-consultant team and design efforts in the following disciplines: roadway, hydraulics, stream realignment and riparian restoration, structures, geotechnical, wetland mitigation, utility relocation, traffic analysis, maintenance of traffic, illumination, signals, tolling and intelligent transportation systems. The firm will also assist with environmental permitting, local agency coordination in support of agreements, design support in the preparation of design-build or design-bid-build contract packages, and subsequent design support in review of the design submittals.

Construction on the extension is expected to start in 2019.

For more information on companies in this article

Related Content

  • Iteris shines with California contracts
    April 29, 2022
    New deals in Orange County and with LA Metro confirm Golden State as key market
  • TransCore wins Scats deployment contract
    April 27, 2012
    TransCore has been selected by Cobb County Department of Transportation, Atlanta, to expand its Scats (Sydney Coordinated Adaptive Traffic System) adaptive traffic signal control technology with an additional 75 intersections, nearly doubling its use of the technology and making it the second largest deployment in the United States. The first phase of 26 intersections in the town centre area are now in operation with the remaining intersections expected to be fully operational by October 2012.
  • FEHRL and FHWA sign memorandum of cooperation
    April 19, 2012
    The Federal Highway Administration (FHWA) of the US Department of Transportation and the Forum of European National Highway Research Laboratories (FEHRL) located in Brussels, Belgium have signed a six-year memorandum of cooperation. This agreement complements the role of the FHWA as an associate of FEHRL, which aims to increase cooperation and coordination in road research, development and deployment, taking into account the shared challenges faced by the FHWA and the members of FEHRL, and the authority pro
  • Connected Vehicle Pilot Program enters phase two
    September 2, 2016
    The US Department of Transportation (USDOT) awarded three cooperative agreements collectively worth more than US$45 million to initiate the design/build/test phase of the Connected Vehicle Pilot Deployment Program. Selected in 2015, the Connected Vehicle Pilot sites include Wyoming, New York City and Tampa.