Skip to main content

WSP/Parsons Brinckerhoff to develop Staten Island transportation improvement strategy

WSP/Parsons Brinckerhoff is to develop a transportation improvement strategy (TIS) to address existing congestion and physical/geometrical issues as well as projected future development on the North Shore of Staten Island. The study, which emerges from the recommendations developed as part of the North Shore 2030 Plan, will be carried out on behalf of the New York City Economic Development Corporation, the New York City Department of City Planning and the New York City Department of Transportation. The s
March 22, 2016 Read time: 2 mins
6666 WSP/4983 Parsons Brinckerhoff is to develop a transportation improvement strategy (TIS) to address existing congestion and physical/geometrical issues as well as projected future development on the North Shore of Staten Island.

The study, which emerges from the recommendations developed as part of the North Shore 2030 Plan, will be carried out on behalf of the New York City Economic Development Corporation, the New York City Department of City Planning and the New York City Department of Transportation.

The study area encompasses the three main arteries connecting Staten Island’s busiest neighbourhoods to most of the borough’s popular destinations. These corridors lead to four large development projects on the North Shore, as well as to the borough’s main transportation hub, the St. George Ferry Terminal. In addition, the Bay Street corridor runs through the area targeted by the city for a neighbourhood re-zoning plan with the goal of creating new housing opportunities.

The arteries have limited capacity and are irregular in their design, and there is community concern that future development will add to existing congestion in the area. The study will recommend improvements related to addressing the demands exerted by new development, and the need for improved mobility and safety, and will establish strategies for transportation improvements for all modes, including pedestrian, ferry, bus, bicycle, and motor vehicles. Existing transportation challenges will be identified, as well as challenges and opportunities anticipated in the near future.

The final TIS document is expected to be completed in summer 2016.

For more information on companies in this article

Related Content

  • Highways England announces multi-million pound major road improvements
    March 16, 2017
    Multi-million pound road improvement schemes announced today by Highways England are set to help unlock the development of more than 4,000 homes and more than 10,900 jobs. The improvements, worth a total of US$92 million ((£75 million), will create opportunities around Derby and Daventry in the Midlands, Oldham in the North West, Durham in the North East and Taunton in the South West. Highways England is making a US$15.3 million (£12.45 million) contribution towards the schemes from its Growth and Hou
  • Germany is Mad for Vitronic
    April 30, 2025
    Managed Automated Driving project takes place in German city of Brunswick
  • Increased automation is already improving road safety
    April 20, 2017
    Richard Cuerden considers how many of the technologies developed as part of a move toward autonomous vehicles are already being deployed as ADAS improve road safety. The drive to create autonomous vehicles has caused a re-evaluation of what is needed to safely navigate today’s roads and the development of systems that can replace the driver in many scenarios. However, many manufacturers are not waiting for ‘tomorrow’ and are already incorporating these systems in their new cars as Advanced Driver Assistanc
  • McCain’s ATC cabinets used in Los Angeles corridor project
    September 28, 2018
    McCain has supplied 10 Advanced Transportation Controller (ATC) cabinets for a newly opened corridor in Los Angeles which is expected to be safe for all users. The My Figueroa Corridor Streetscape Project (MyFig) was unveiled by the Los Angeles Department of Transportation (LADoT). It covers four miles of streets stretching from the downtown area to the south part of the city. McCain says its 351 ATC cabinets has doubled the corridor’s output channels to 32, which will allow the city to add more sign