Skip to main content

WSP/Parsons Brinckerhoff to develop Staten Island transportation improvement strategy

WSP/Parsons Brinckerhoff is to develop a transportation improvement strategy (TIS) to address existing congestion and physical/geometrical issues as well as projected future development on the North Shore of Staten Island. The study, which emerges from the recommendations developed as part of the North Shore 2030 Plan, will be carried out on behalf of the New York City Economic Development Corporation, the New York City Department of City Planning and the New York City Department of Transportation. The s
March 22, 2016 Read time: 2 mins
6666 WSP/4983 Parsons Brinckerhoff is to develop a transportation improvement strategy (TIS) to address existing congestion and physical/geometrical issues as well as projected future development on the North Shore of Staten Island.

The study, which emerges from the recommendations developed as part of the North Shore 2030 Plan, will be carried out on behalf of the New York City Economic Development Corporation, the New York City Department of City Planning and the New York City Department of Transportation.

The study area encompasses the three main arteries connecting Staten Island’s busiest neighbourhoods to most of the borough’s popular destinations. These corridors lead to four large development projects on the North Shore, as well as to the borough’s main transportation hub, the St. George Ferry Terminal. In addition, the Bay Street corridor runs through the area targeted by the city for a neighbourhood re-zoning plan with the goal of creating new housing opportunities.

The arteries have limited capacity and are irregular in their design, and there is community concern that future development will add to existing congestion in the area. The study will recommend improvements related to addressing the demands exerted by new development, and the need for improved mobility and safety, and will establish strategies for transportation improvements for all modes, including pedestrian, ferry, bus, bicycle, and motor vehicles. Existing transportation challenges will be identified, as well as challenges and opportunities anticipated in the near future.

The final TIS document is expected to be completed in summer 2016.

For more information on companies in this article

Related Content

  • New York unveils ‘Midtown in Motion’ traffic management system
    April 19, 2012
    New York Mayor Bloomberg has unveiled a new, technology-based traffic management system that allows city traffic engineers to monitor and respond to Midtown Manhattan traffic conditions in real time, improving traffic flow on the city’s most congested streets.
  • Economic stimulus and investment in ITS solutions
    February 2, 2012
    Scott Belcher, President and CEO of ITS America looks at the year ahead
  • Infrastructure projects ‘should be software-ready as well as shovel-ready’
    May 21, 2014
    In his blog in The Hill, Siemens president of Infrastructure & Cities Sector, Daryl Dulaney claims that, while physical improvements to transportation systems are essential, more consideration needs to be given to incorporating more intelligent technologies. He claims, “Significant improvements in mobility can be made, with minimal investment as compared with large-scale physical transportation projects, by utilising intelligent transportation software in our cities and municipalities. Integrating the us
  • Report analyses multiple ITS projects to highlight cost and benefits
    March 16, 2015
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re