Skip to main content

WSP/Parsons Brinckerhoff to develop Staten Island transportation improvement strategy

WSP/Parsons Brinckerhoff is to develop a transportation improvement strategy (TIS) to address existing congestion and physical/geometrical issues as well as projected future development on the North Shore of Staten Island. The study, which emerges from the recommendations developed as part of the North Shore 2030 Plan, will be carried out on behalf of the New York City Economic Development Corporation, the New York City Department of City Planning and the New York City Department of Transportation. The s
March 22, 2016 Read time: 2 mins
6666 WSP/4983 Parsons Brinckerhoff is to develop a transportation improvement strategy (TIS) to address existing congestion and physical/geometrical issues as well as projected future development on the North Shore of Staten Island.

The study, which emerges from the recommendations developed as part of the North Shore 2030 Plan, will be carried out on behalf of the New York City Economic Development Corporation, the New York City Department of City Planning and the New York City Department of Transportation.

The study area encompasses the three main arteries connecting Staten Island’s busiest neighbourhoods to most of the borough’s popular destinations. These corridors lead to four large development projects on the North Shore, as well as to the borough’s main transportation hub, the St. George Ferry Terminal. In addition, the Bay Street corridor runs through the area targeted by the city for a neighbourhood re-zoning plan with the goal of creating new housing opportunities.

The arteries have limited capacity and are irregular in their design, and there is community concern that future development will add to existing congestion in the area. The study will recommend improvements related to addressing the demands exerted by new development, and the need for improved mobility and safety, and will establish strategies for transportation improvements for all modes, including pedestrian, ferry, bus, bicycle, and motor vehicles. Existing transportation challenges will be identified, as well as challenges and opportunities anticipated in the near future.

The final TIS document is expected to be completed in summer 2016.

For more information on companies in this article

Related Content

  • Independent review says most bus lanes should go
    October 28, 2014
    An independent review of Liverpool’s bus lanes is recommending that the majority be removed, but four in the city centre will be retained. On a number of other routes, measures such as bus detector loops are recommended. The city’s 26 bus lanes were suspended in October 2013 to monitor and analyse the effects on congestion and traffic flow. Transport consultant Mott MacDonald has carried out the review and their work was supported by groups of elected members, bus operators and the partners.
  • Canada looks to HOT lanes to tackle congestion
    March 16, 2017
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • Two wheels good
    June 25, 2018
    As cycling becomes an increasingly popular method for commuting and recreation, what moves are afoot to keep the growing numbers of cyclists safe on ever-more-busy roads? Alan Dron puts on his helmet and pedals off to look. It would have seemed incredible just a decade ago, but cycling in London has become almost unfeasibly popular. The Transport for London (TfL) June 2017 Strategic Cycling Analysis document noted there were now 670,000 cycle trips a day in the UK capital, an increase of 130% since 2000.
  • Balfour to deliver Bay Street corridor project 
    September 17, 2021
    Balfour partners include Superior Construction, Stantec and Miller Electric