Skip to main content

World Bank to support integrated transport project in China

The World Bank’s Board of Executive Directors approved a loan of US$120 million to China to support the integrated transport development in the Wuhan Metropolitan Region. Located in Hubei Province in central China, the Wuhan Metropolitan Region is a city cluster formed by eight smaller cities within a 100-kilometre radius of the core city Wuhan and has been selected as a pilot in China’s search for a new urban development model attuned to the national goals of promoting equity and environmental sustainab
March 2, 2016 Read time: 2 mins
The 2000 World Bank’s Board of Executive Directors approved a loan of US$120 million to China to support the integrated transport development in the Wuhan Metropolitan Region.

Located in Hubei Province in central China, the Wuhan Metropolitan Region is a city cluster formed by eight smaller cities within a 100-kilometre radius of the core city Wuhan and has been selected as a pilot in China’s search for a new urban development model attuned to the national goals of promoting equity and environmental sustainability. The Wuhan Integrated Transport Development Project is aimed at improving transport within the region, which is critical for its overall economic functioning and for improving connectivity and integration.

More than 50 per cent of the World Bank financing will go to Anlu, a small city located within Xiaogan Municipality, one of the eight peripheral cities in the cluster, to finance improvements to selected road infrastructure, road safety measures, non-motorised transport facilities and public transport. Another major part of the financing is for strengthening the intelligent transport systems for Wuhan. The 642,500 residents in Anlu and 10.3 million residents in Wuhan are expected to benefit from the project.

“The project will focus on using technology to enable more seamless trips and reduce congestion, improving public transport and non-motorized transport; and enabling more equal access to transport for all sections of society, especially the poor,” said Arturo Ardila Gomez, World Bank team leader for the project. “Through these features, we hope to help achieve a more integrated and therefore balanced urban development pattern in the Wuhan Metropolitan Region. It will also showcase innovative integration solutions within each city as a model for replication in similar situations.”

Related Content

  • June 29, 2018
    Avoiding the call of the wild
    Hitting an animal on a rural road can be fatal for all parties involved – but detecting and avoiding them requires clever technology. Andrew Williams carefully scans the horizon for details. Wildlife-vehicle collisions are an ever-present threat in rural areas around the world, and there is certainly nothing funny about suddenly finding an angry moose in your headlights on a sharp bend. A variety of detection and avoidance systems are currently in use or under development to help prevent your vehicle being
  • March 6, 2023
    WTS International Policy Symposium 2023: register here
    Day-and-a-half long programme will throw a spotlight on transportation and equity
  • February 3, 2012
    Detection analysis technology successfully predicts traffic flows
    David Crawford investigates new detection analysis technology from IBM. Locations on both the East and West Coasts of the US are scheduled for early deployments of IBM's new Traffic Prediction Tool (TPT) statistical analysis model for the fine-time resolution and near-term prediction of road flow conditions. Developed by IBM's Watson Research Laboratories, TPT is designed to analyse data from the the key detection indicators - average vehicle volumes and speeds passing a location in a given time interval -
  • September 15, 2014
    Kapsch’s scalable tolling back office accepts mixed feeds
    Arno Klamminger and Wolfgang Fleischer from Kapsch’s ETC Business Unit outline a new back office solution which addresses the ongoing changes in the road user charging sector. The rapidly increasing scale of some Road User Charging (RUC) schemes, both current and proposed, presents systems developers and manufacturers with significant opportunities in terms of product sales. However, it also presents them with significant challenges - and size is but one part – as at regional, national and international lev