Skip to main content

Work begins on Warrington motorway trial to cut congestion

Work on a US$8.5 million (£7 million) pilot scheme to cut congestion along the M62 near Warrington in Cheshire, UK is to start next month. Highways England is delivering the innovative project at Croft Interchange to give drivers smoother and more reliable journeys along the eastbound M62, one of the busiest commuter congestion hotspots in the region. From next summer, smart motorway technology, such as electronic information signs and variable mandatory speed limits on the M62, will be used alongside
October 28, 2016 Read time: 1 min
Work on a US$8.5 million (£7 million) pilot scheme to cut congestion along the M62 near Warrington in Cheshire, UK is to start next month.

8101 Highways England is delivering the innovative project at Croft Interchange to give drivers smoother and more reliable journeys along the eastbound M62, one of the busiest commuter congestion hotspots in the region.

From next summer, smart motorway technology, such as electronic information signs and variable mandatory speed limits on the M62, will be used alongside traffic lights on the motorway link roads from the northbound and southbound M6.

Money for the project is coming from a US$182.6 million (£150 million) innovation fund, part of the US$18.2 billion (£15 billion) allocated to Highways England in the Government’s 2015 to 2020 Road Investment Strategy.

The innovation fund is designed to encourage Highways England to look at new technology or novel techniques to improve journeys.

For more information on companies in this article

Related Content

  • MVIS and Bartco UK partner on smart motorway journey time system
    September 21, 2015
    Mobile Visual Information Systems (MVIS) and Bartco UK have partnered on the creation of a journey time solution (JTS) for Bam Morgan Sindall Joint Venture (BMJV) and Costain, contracted by Highways England. The JTS comprises 157 A and C portable VMS, manufactured in the UK by Bartco UK, along with 50 Vysionics Vector integrated ANPR cameras and MVIS’ Web Studio sign management system. It forms part of a new customer experience pilot project on the M1 corridor, which incorporates smart motorway roadworks
  • Free-flow tolls for new £2bn Thames crossing
    November 16, 2020
    More than 27 million drivers annually may use the planned Lower Thames Crossing near London
  • Countering congestion’s cost
    May 6, 2015
    A new report on the economic costs of traffic congestion predicts the problem will worsen significantly in future. Jon Masters reviews the figures and some suggested solutions. New figures on the rising economic and environmental costs of congestion have been published by the US traffic data specialist Inrix and the UK’s Centre for Economics & Business Research (Cebr). Their report finds the problem much bigger than previously thought.
  • Two initiatives announced to cut road works disruption in London
    May 17, 2012
    A joint US$1.6 million fund to research and develop new technology to reduce the disruption caused by road works was announced yesterday by UK Transport Secretary, Philip Hammond and the Mayor of London, Boris Johnson. Confirmation of a lane rental scheme for roadworks was also announced at the same time.