Skip to main content

Work begins on Warrington motorway trial to cut congestion

Work on a US$8.5 million (£7 million) pilot scheme to cut congestion along the M62 near Warrington in Cheshire, UK is to start next month. Highways England is delivering the innovative project at Croft Interchange to give drivers smoother and more reliable journeys along the eastbound M62, one of the busiest commuter congestion hotspots in the region. From next summer, smart motorway technology, such as electronic information signs and variable mandatory speed limits on the M62, will be used alongside
October 28, 2016 Read time: 1 min
Work on a US$8.5 million (£7 million) pilot scheme to cut congestion along the M62 near Warrington in Cheshire, UK is to start next month.

8101 Highways England is delivering the innovative project at Croft Interchange to give drivers smoother and more reliable journeys along the eastbound M62, one of the busiest commuter congestion hotspots in the region.

From next summer, smart motorway technology, such as electronic information signs and variable mandatory speed limits on the M62, will be used alongside traffic lights on the motorway link roads from the northbound and southbound M6.

Money for the project is coming from a US$182.6 million (£150 million) innovation fund, part of the US$18.2 billion (£15 billion) allocated to Highways England in the Government’s 2015 to 2020 Road Investment Strategy.

The innovation fund is designed to encourage Highways England to look at new technology or novel techniques to improve journeys.

UTC

Related Content

  • August 27, 2014
    Roads revolution adds 900 miles of extra capacity
    Road users in the UK will see around 900 extra lane miles of road capacity added to England’s strategic highway network by 2021, a third more than was provided in the previous decade. The boost is thanks to a huge US£39.7 billion investment, the biggest since the 1970s, which will see annual funding for enhancements to motorways and major A roads triple over the next six years. Investment includes more than US$15 billion on maintenance, US$10 billion of which will be spent on resurfacing 3,000 miles of t
  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • November 2, 2017
    RAC: over half of drivers believe congestion has worsened on UK major roads
    56% of 1,727 drivers questioned in an annual survey believe that congestion has worsened on UK major roads, which carries 65% of all traffic, despite them comprising only 13% of the country’s road network. The findings from the survey have been presented by the RAC’s Report on Motoring.
  • March 15, 2012
    Traffic signals turn red to stop speeding drivers
    David Crawford is encouraged by the spread of 'soft' speed policing