Skip to main content

Work begins on Johannesburg’s Great Walk Bridge

Construction has begun on a US$10.7 million pedestrian and cycling bridge over one of Africa's busiest highways in Johannesburg. ‘The Great Walk Bridge’ will form part of a dedicated five kilometre pedestrian and cycling path from the heart of Alexandra to the centre of the Sandton central business district - providing a quicker, safer route for the estimated 10,000 people who walk or cycle between the two areas daily. Construction, which is being implemented by the Johannesburg Development Agency (JDA) on
March 9, 2015 Read time: 2 mins
Construction has begun on a US$10.7 million pedestrian and cycling bridge over one of Africa's busiest highways in Johannesburg.

‘The Great Walk Bridge’ will form part of a dedicated five kilometre pedestrian and cycling path from the heart of Alexandra to the centre of the Sandton central business district - providing a quicker, safer route for the estimated 10,000 people who walk or cycle between the two areas daily.

Construction, which is being implemented by the Johannesburg Development Agency (7362 JDA) on behalf of the City of Johannesburg, is due to be completed by October 2016.

"This project was initiated after a transport study indicated that as many as 10,000 pedestrians walk to and from Alexandra to employment in Sandton each day," JDA chief executive officer Thanduxolo Mendrew said at the sod-turning ceremony.

The bridge was designed by Royal Haskoning and is being built by Murray AND Roberts, with safety a top priority. It will incorporate three-metre wide pedestrian and cycling pathways separated by barriers from vehicles once it reaches the road. Concrete bollards will be placed on curves to prevent vehicle access.

For more information on companies in this article

Related Content

  • Developing ‘next generation’ traffic control centre technology
    July 4, 2012
    The Rijkswaterstaat and Highways Agency have joined forces to investigate what the market can do to realise an idealistic vision for traffic control centre technology. Jon Masters reports One particular seminar session of the Intertraffic show in Amsterdam in March was notably over subscribed. So heavy was the press to attend that your author, making his way over late from another appointment, could not get in and found himself craning over other heads locked outside to overhear what was being said. The
  • ITS needs continuity at the policy-making level
    February 1, 2012
    ITS needs to be sold to politicians in plainer terms and we need to be encouraging greater continuity at the policy-making level says Josef Czako, chairman of the IRF's Policy Committee on ITS. At the ITS World Congress in New York in 2008, the International Road Federation (IRF) held the inaugural meeting of its Policy Committee on ITS. The Policy Committee's formation, says its chairman, Kapsch's Josef Czako, reflects an ongoing concern over the lack of deployment of ITS technology on roads in anything li
  • Grants available to encourage more Londoners to take up cycling
    July 31, 2017
    Transport for London (TfL) is inviting community and not-for-profit groups across London to apply for grants to get their communities cycling. This year TfL is making available up to US$393,000 (£300,000) to help 30 groups offer a range of cycling initiatives aimed at people who may not otherwise ride a bike. Initiatives include cycle training, loan bikes, guided rides and courses to teach basic cycle maintenance. New projects will receive up to US$13,000 (£10,000) over three years. To encourage an even wid
  • IRF World Congress 2024: 'Silent pandemic' of road deaths must be reduced
    October 16, 2024
    Day 1 of three-day meeting in Istanbul focuses on sustainability and safety