Skip to main content

Work begins on Johannesburg’s Great Walk Bridge

Construction has begun on a US$10.7 million pedestrian and cycling bridge over one of Africa's busiest highways in Johannesburg. ‘The Great Walk Bridge’ will form part of a dedicated five kilometre pedestrian and cycling path from the heart of Alexandra to the centre of the Sandton central business district - providing a quicker, safer route for the estimated 10,000 people who walk or cycle between the two areas daily. Construction, which is being implemented by the Johannesburg Development Agency (JDA) on
March 9, 2015 Read time: 2 mins
Construction has begun on a US$10.7 million pedestrian and cycling bridge over one of Africa's busiest highways in Johannesburg.

‘The Great Walk Bridge’ will form part of a dedicated five kilometre pedestrian and cycling path from the heart of Alexandra to the centre of the Sandton central business district - providing a quicker, safer route for the estimated 10,000 people who walk or cycle between the two areas daily.

Construction, which is being implemented by the Johannesburg Development Agency (7362 JDA) on behalf of the City of Johannesburg, is due to be completed by October 2016.

"This project was initiated after a transport study indicated that as many as 10,000 pedestrians walk to and from Alexandra to employment in Sandton each day," JDA chief executive officer Thanduxolo Mendrew said at the sod-turning ceremony.

The bridge was designed by Royal Haskoning and is being built by Murray AND Roberts, with safety a top priority. It will incorporate three-metre wide pedestrian and cycling pathways separated by barriers from vehicles once it reaches the road. Concrete bollards will be placed on curves to prevent vehicle access.

Related Content

  • April 19, 2012
    Unlit bollard liability for UK authorities
    A ruling by a court in Cambridge is likely to have major implications for councils and authorities across the UK after a cyclist won compensation when he collided with a bollard at night. These were placed on a cycle route to prevent vehicular access to the cycle path, which runs alongside the River Cam and is used day and night by cyclists who commute to/from Cambridge, as a safer alternative to using the busy A10.
  • September 5, 2022
    On the road with France’s dream peddlers
    Connected cycling is becoming more important in France as the way to keep cyclists from giving up their Covid habit of taking two wheels to work and for pleasure
  • November 13, 2012
    Traffic to flow freely over world’s widest bridge
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • April 30, 2015
    Cable cars come of age in trans-continental expansion
    David Crawford explores a high-level option of public transport. Sharing its origin with that of ski lifts at winter sports resorts in the European Alps, urban aerial cable transport is attracting growing interest as a low-footprint, low-energy alternative to conventional public transport that can swoop over ground-level traffic congestion.