Skip to main content

Virginia expands travel information on I-66

Virginia Department of Transportation (VDOT) is to expand the traffic information system on Interstate 66 (I-66). Motorists will now see travel times displayed on overhead message signs for the 35 miles from Washington to Haymarket. VDOT has been posting the number of miles and minutes to key destinations at three locations between the Capital Beltway and Gainesville since August 2011. Message signs will display the information at seven new locations. In addition, by summer, six more locations will be ad
April 4, 2013 Read time: 2 mins
1747 Virginia Department of Transportation (VDOT) is to expand the traffic information system on Interstate 66 (I-66).  Motorists will now see travel times displayed on overhead message signs for the 35 miles from Washington to Haymarket.  VDOT has been posting the number of miles and minutes to key destinations at three locations between the Capital Beltway and Gainesville since August 2011.  Message signs will display the information at seven new locations. In addition, by summer, six more locations will be added: two on I-66 and four locations on major roads approaching I-66.  Travel times will be displayed weekdays from 5 a.m. to 9 p.m. and weekends from 8 a.m. to 8 p.m.

VDOT is using traffic data from 163 Inrix and other sources to determine the travel times. Traffic controllers at the Public Safety Transportation Operations Center in Fairfax County will ensure the travel times are successfully relayed to the electronic message signs and are accurately refreshed every five minutes.

 “This will give motorists continually updated information on traffic conditions ahead, allowing them to take more control over their commute,” said Governor Bob McDonnell.  “Northern Virginia has the most congested roads in the nation and too many hours and dollars are wasted sitting in traffic. Thankfully, together with the General Assembly we have taken historic action this year to produce a long-term, sustainable transportation funding solution.  We must continue to encourage innovative solutions, like this, in order to build the world class, 21st century transportation network Virginians deserve."

For more information on companies in this article

Related Content

  • Major setback for California bullet train
    August 27, 2013
    The California High-Speed Rail project, which aims to connect the mega-regions of the state, contribute to economic development and a cleaner environment, create jobs and preserve agricultural and protected lands, was dealt a serious blow when Judge Michael Kenny of the Sacramento Superior Court ruled that the California High-Speed Rail Authority "abused its discretion by approving a funding plan that did not comply with the requirements of the law."
  • Activu and Mitsubishi give New Jersey controllers the big picture
    May 27, 2014
    Mitsubishi and Activu team up to help New Jersey emergency centre with real-time situational awareness. Sandy was the largest Atlantic hurricane in recorded history, with winds spanning an area of 1,100 miles and damages estimated at $68 billion. It killed at least 286 people in seven countries, from Jamaica to the Jersey Shore. But tropical storms are not the only challenge for emergency operations up and down the East Coast.
  • FHWA proposes new performance measures to reduce highway congestion
    April 19, 2016
    The US Department of Transportation’s Federal Highway Administration (FHWA) today released a proposed regulation outlining new performance measures to assess travel reliability, congestion, and emissions at a national level. It calls for an increased level of transparency and accountability in establishing and achieving targets for performance impacting commuters and truck drivers. The measures address the concerns outlined in the USDOT report Beyond Traffic, which examines the trends and choices facing
  • Lindsay zips-up lane closure solution
    May 11, 2017
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.