Skip to main content

Video: giant gantry is lifted overnight on the M6, UK

Highways England has released timelapse footage which shows a 20-tonne gantry being lifted over the M6 during an overnight operation in June. The 40m-wide structure will host 10 electronic signs between junctions 18 and 19 is being installed as part of a £274 million smart motorway project in Cheshire. The scheme will be completed in phases with all roadworks due to be removed by Spring 2019.
October 8, 2018 Read time: 1 min

8101 Highways England has released timelapse footage which shows a 20-tonne gantry being lifted over the M6 during an overnight operation in June.

The 40m-wide structure will host 10 electronic signs between junctions 18 and 19 is being installed as part of a £274 million smart motorway project in Cheshire.

The scheme will be completed in phases with all roadworks due to be removed by Spring 2019.

For more information on companies in this article

Related Content

  • Progressing work zone safety systems
    February 6, 2012
    David Crawford investigates progress in a key safety area - work zones
  • Highways England's Eastern Regional Control Centre upgraded
    June 1, 2016
    Audio-visual systems integrator Electrosonic has recently installed a dynamic display system (DDS) at Highways England’s Eastern Regional Control Centre in South Mimms. Comprising of LED illuminated cubes, the new DDS technology provides a solution that is virtually maintenance free, energy efficient and suitable for 24/7 usage. Electrosonic installed an 8x3 array of Mitsubishi Electric 67PE78, 67-inch SXGA+ LED illuminated cubes, which are brighter, of higher resolution and use less power than their pre
  • TWM wins UK traffic sign deal
    March 1, 2021
    Firm to supply and install all electronic vehicle-activated signage in England’s Wirral
  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.