Skip to main content

Video: giant gantry is lifted overnight on the M6, UK

Highways England has released timelapse footage which shows a 20-tonne gantry being lifted over the M6 during an overnight operation in June. The 40m-wide structure will host 10 electronic signs between junctions 18 and 19 is being installed as part of a £274 million smart motorway project in Cheshire. The scheme will be completed in phases with all roadworks due to be removed by Spring 2019.
October 8, 2018 Read time: 1 min

8101 Highways England has released timelapse footage which shows a 20-tonne gantry being lifted over the M6 during an overnight operation in June.

The 40m-wide structure will host 10 electronic signs between junctions 18 and 19 is being installed as part of a £274 million smart motorway project in Cheshire.

The scheme will be completed in phases with all roadworks due to be removed by Spring 2019.

For more information on companies in this article

Related Content

  • Kapsch to deploy tolling roadside systems in Australia
    December 17, 2018
    Kapsch TrafficCom Australia is to deliver a tolling roadside system for two projects in Melbourne and Sydney for a combined value of AUD$30 million (£17m). In Melbourne, Kapsch’s tolling technology will be utilised in the West Gate Tunnel Project, an initiative which seeks to establish a second river crossing in the city and remove thousands of trucks from residential streets. Part of an agreement between two contractors: CPB Contractors John Holland Joint Venture (CPBJH JV), the full scope of the contr
  • Brazil proposes major investment in highway works
    September 19, 2014
    The administration of Brazilian president Dilma Rousseff has proposed investments of US$4.23 billion to improve the country's highway network in 2015. The investments would fall under the PAC growth acceleration plan. The bill calls for transport infrastructure department DNIT to manage US$4 billion in highway maintenance and upkeep, including highway BR-381 in the state of Minas Gerais between highway junctions BR-116 in the city of Governador Valadares and state highway MG-020. Other large investments
  • IRD wins WIM sorter system contract
    May 16, 2012
    International Road Dynamics (IRD) has received a contract valued at approximately US$1.22 million from Canada's Prince Edward Island Department of Transportation and Infrastructure Renewal (PEI DTIR). The contract is for the supply, installation, and maintenance of a mainline weigh-in-motion (WIM) sorter system, and will complement the weigh station operation located 1 km east bound of the Confederation Bridge. Installation is scheduled for completion by the end of June 2011.
  • Highways Agency launches Bag and Bin it litter campaign
    April 7, 2014
    The Bag and Bin it campaign recently launched by the UK’s Highway’s Agency runs until the end of April and aims to tackle the more than 7,500 tonnes of litter thrown on to the nation’s highways each year. The litter blighting England's motorways costs at least US£9 million a year to collect and could fill an Olympic-sized swimming pool four times over, according to the latest figures from the Highways Agency.