Skip to main content

Vehicle to improve safety and reduce disruption on motorways

Inspired by the aviation industry, a new vehicle developed by Highways England to help replace overhead signs is set to reduce the duration of roadworks. The vehicle is based on the design of an aircraft catering vehicle, which loads refreshments into aeroplanes using a hydraulic scissor lift. Traditionally, signs are taken down and installed using a flat-bed truck, crane and cherry picker, taking up to 40 minutes. However the new Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 min
May 26, 2016 Read time: 2 mins
Inspired by the aviation industry, a new vehicle developed by 8101 Highways England and Mott MacDonald to help replace overhead signs is set to reduce the duration of roadworks.

The vehicle is based on the design of an aircraft catering vehicle, which loads refreshments into aeroplanes using a hydraulic scissor lift.

Traditionally, signs are taken down and installed using a flat-bed truck, crane and cherry picker, taking up to 40 minutes. However the new Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 minutes by using a small jib crane which is part of the vehicle.

Road workers will also be able to shut fewer lanes using the MAV, which has been successfully trialled on the roads. The device also provides a safer environment for road workers while they work inside the vehicle - and on a sturdy platform while they work outside it.

Once the platform is raised to a sufficient height, the jib crane carefully attaches to the sign on the gantry and lifts it off.  The operatives then detach the sign, place it onto a trolley on the platform, and wheel it into the main compartment of the vehicle. The procedure is reversed when installing a new electronic sign.

The hydraulically powered scissor lift enables the signs, which are often found on smart motorway gantries, to be serviced at heights of up to 8.5 metres and in wind speeds of up to 47mph. Furthermore, its CCTV cameras, which play a critical safety role, enable the driver to park the vehicle in exactly the correct place below the gantry before any maintenance takes place and monitor the operatives at the back while they work.

Highways England is currently examining the best way for its contractors to purchase the machines. It is estimated that if the device was widely adopted it could save up to US$6 million (£4 million) a year.

Consideration is also being given as to whether it could be used to improve safety for other duties on England’s motorways and major A roads.

For more information on companies in this article

Related Content

  • Roads revolution adds 900 miles of extra capacity
    August 27, 2014
    Road users in the UK will see around 900 extra lane miles of road capacity added to England’s strategic highway network by 2021, a third more than was provided in the previous decade. The boost is thanks to a huge US£39.7 billion investment, the biggest since the 1970s, which will see annual funding for enhancements to motorways and major A roads triple over the next six years. Investment includes more than US$15 billion on maintenance, US$10 billion of which will be spent on resurfacing 3,000 miles of t
  • Weighing up the future with AI
    April 14, 2022
    There is broad agreement that artificial intelligence will be an important part of Weigh in Motion as we go forward – but Adam Hill finds that not everyone agrees quite how close we are to that point
  • Kent County Council and Highways England partner on road management
    June 3, 2015
    Drivers in Kent are set to benefit from better journeys thanks to a new agreement between Kent County Council and Highways England. The new partnership agreement will improve planning and communication between the two organisations and improve journeys for the many thousands of drivers who use Kent’s road network every day. The two organisations will share information about incidents better to improve the information on the county’s message signs. Roadworks will be co-ordinated to ensure that the dive
  • Major road schemes to reduce road congestion and boost economy
    April 11, 2013
    The Highways Agency is to deliver a further twenty-two schemes in the UK’s north-west to boost the economy, reduce congestion and improve safety in the third, and final, stage of its pinch point programme. The schemes, representing an investment of US$47.7 million, will remove bottlenecks and keep traffic moving on England’s motorways and major A roads. Nationally, this stage of the programme comprises 58 schemes, worth US$151 million, that will be delivered by March 2015 and will bring an estimated US$2.1