Skip to main content

Vancouver to replace tunnel with toll bridge

In an effort to reduce "the worst bottleneck" to traffic in the region, Vancouver, British Columbia, is to replace the Massey Tunnel on highway 99 with a wider bridge that is expected to be a tolled. The four-lane lane tunnel, which opened in 1959, is heavily overloaded for much of the day, carrying an average daily traffic of around 80,000 vehicles. Public consultation favoured a new bridge over the alternatives of renovation and additional tubes.
September 30, 2013 Read time: 2 mins
In an effort to reduce "the worst bottleneck" to traffic in the region, Vancouver, British Columbia, is to replace the Massey Tunnel on highway 99 with a wider bridge that is expected to be a tolled.

The four-lane lane tunnel, which opened in 1959, is heavily overloaded for much of the day, carrying an average daily traffic of around 80,000 vehicles.  Public consultation favoured a new bridge over the alternatives of renovation and additional tubes.

It is believed that a bridge should be less susceptible to earthquake damage, while removal of the tunnel will eliminate an obstacle to deepening of the channel for shipping.  Cost of building the bridge is anticipated to be around US$970 million.

Engineering and technical work is now under way to develop a project scope and business case for the new bridge and associated Highway 99 corridor improvements. This work will be presented for public discussion next spring, ensuring that the project remains on track for construction to begin in 2017.

Related Content

  • Making the most of Michigan
    January 9, 2018
    Michigan DoT’s Kirk Steudle takes time out from the ITS World Congress in Montreal to talk to Colin Sowman. Thirty years ago, a professional engineer named Kirk Steudle joined Michigan Department of Transportation (MDoT). Today he’s the state transportation director, responsible for more than 16,000km (10,000 miles) of state highways (including 4,000 bridges), some 2,500 employees and a budget of more than $4 billion. We caught up with Steudle during the ITS World Congress in Montreal and asked how he
  • Upgrading Turkey's tolling system
    April 25, 2013
    A programme modernising road tolling equipment on Turkey’s national highway network has resulted in what is arguably Europe’s most advanced toll system, reports Jon Masters. Turkey has introduced a new system of technology for charging for use of its 2000km national highway network, heralded as the first full-scale use of passive RFID tags for electronic open road tolling in Europe. The new ‘Fast Passing System’ (HGS) is an upgrade of Turkey’s existing Automatic Passing System (OGS) technology, which uses
  • Nearly 59,000 US bridges still structurally deficient, new analysis finds
    February 19, 2016
    According to the US Department of Transportation's recently-released 2015 National Bridge Inventory database, there were 2,574 fewer structurally deficient bridges in 2015 compared to the number in 2014. However, there are still 58,500 on the structurally deficient list and at the current pace of bridge investment it would take at least 21 years before they were all replaced or upgraded. The American Road & Transportation Builders Association (ARTBA), which conducts an annual review of state bridge da
  • Loop detection still has a part in traffic management
    March 2, 2012
    Bob Lees, co-founder of Diamond Consulting Services, on why the loop detector just refuses to go away. The more strident proponents of newer and emergent detection technologies are quick to highlight what they see as the disadvantages, and hence the imminent passing, of the humble inductive loop. The more prosaic will acknowledge that loops continue to have a part to play in traffic management, falling back on the assertion that it is all a question of application. And yet year after year the loop, despite