Skip to main content

Vancouver to replace tunnel with toll bridge

In an effort to reduce "the worst bottleneck" to traffic in the region, Vancouver, British Columbia, is to replace the Massey Tunnel on highway 99 with a wider bridge that is expected to be a tolled. The four-lane lane tunnel, which opened in 1959, is heavily overloaded for much of the day, carrying an average daily traffic of around 80,000 vehicles. Public consultation favoured a new bridge over the alternatives of renovation and additional tubes.
September 30, 2013 Read time: 2 mins
In an effort to reduce "the worst bottleneck" to traffic in the region, Vancouver, British Columbia, is to replace the Massey Tunnel on highway 99 with a wider bridge that is expected to be a tolled.

The four-lane lane tunnel, which opened in 1959, is heavily overloaded for much of the day, carrying an average daily traffic of around 80,000 vehicles.  Public consultation favoured a new bridge over the alternatives of renovation and additional tubes.

It is believed that a bridge should be less susceptible to earthquake damage, while removal of the tunnel will eliminate an obstacle to deepening of the channel for shipping.  Cost of building the bridge is anticipated to be around US$970 million.

Engineering and technical work is now under way to develop a project scope and business case for the new bridge and associated Highway 99 corridor improvements. This work will be presented for public discussion next spring, ensuring that the project remains on track for construction to begin in 2017.

Related Content

  • Running on empty
    May 2, 2018
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • Ending tolling on Texas roads ‘would come at a high price’
    September 12, 2016
    Eliminating tolls on state highways throughout Texas would be prohibitively expensive, state legislators who are considering such a plan have learned, says the National Council for Public-Private Partnerships. Texas Department of Transportation (TxDOT) undertook research how much it would take to eliminate the highways for which it is responsible. It estimates the price of removing tolls on those highways would be at least US$24.2 billion and would increase over time, TxDOT executive director James Bass
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • Vancouver explores new rapid transit crossing
    March 9, 2020
    A feasibility study in the Canadian city of Vancouver is to explore six routes for a potential new transit crossing across the Burrard Inlet to the North Shore.