Skip to main content

Vancouver narrows bridge & tunnel options

The Burrard Inlet Rapid Transit Study has now identified five potential crossings
By David Arminas September 21, 2020 Read time: 2 mins
Transport crossings in Vancouver: more needed (© Vismax | Dreamstime.com)

The British Columbia government has identified five potential crossings for the proposed high-capacity rapid transit across the Burrard Inlet from Vancouver to the North Shore.

The technical feasibility study, led by engineering consultancy Mott MacDonald Canada, has come up with three tunnel and two bridge proposals for cars and buses.

The plan will help inform the long-term Transport 2050 planning, led by TransLink and the Mayors’ Council, according to a statement by the BC government’s Ministry of Transportation and Infrastructure.

Possible routes for future planning consideration (see map below) are:

  • Downtown Vancouver to Lonsdale via First Narrows (tunnel)
  • Downtown Vancouver to Lonsdale via Brockton Point (tunnel)
  • Downtown Vancouver to West Vancouver via Lonsdale (tunnel)
  • Downtown Vancouver to Lonsdale via Second Narrows (new bridge)
  • Burnaby to Lonsdale via Second Narrows (new bridge)

The ministry, the districts of North Vancouver and West Vancouver and the cities of Vancouver and North Vancouver all contributed funding towards the study. TransLink oversaw the technical work.

The technical feasibility study was also the first to be a co-ordinated effort by the BC province in partnership with Indigenous governments, municipalities and TransLink to identify a potential rapid transit solution across the Burrard Inlet.

TransLink is the Vancouver area’s regional transportation authority coordinating transit throughout the lower mainland area – around the Fraser River Valley.

The Mayors' Council, set up by TransLink, is composed of representatives from each of the 21 municipalities within the transportation service region. It also includes Indigenous – native American - groups such as the Tsawwassen First Nation.

Improved transit is part of the BC government’s CleanBC plan that aims to reduce congestion and carbon pollution. CleanBC was developed in collaboration with the BC Green Party, an environmental political party.

Vancouver transit plan
Map courtesy of British Columbia Ministry of Transportation and Infrastructure

 

Related Content

  • RFQ for Knik Arm Crossing toll bridge in Alaska
    April 19, 2012
    The Knik Arm Bridge and Toll Authority (KABATA) has issued a Request for Qualifications (RFQ) for concessionaires to design, construct, finance, operate and maintain the Knik Arm Crossing under an availability payment public-private partnership. Statements of Qualifications (SOQ) are due 15 September, 2011 at 4:00PM Alaska Daylight Saving Time. The RFQ can be downloaded at http://notes4.state.ak.us/pn/pubnotic.nsf or interested parties can receive the RFQ by contacting Michele Casey at michele.casey@alaska
  • Integrated transport network proposed for Montréal
    April 25, 2016
    DPQ Infra, a subsidiary of Caisse de dépôt et placement du Québec, has unveiled for its Réseau électrique métropolitain (REM), an integrated public transportation project. Under the proposal, the REM will link downtown Montréal, the South Shore, the West Island (Sainte-Anne-de-Bellevue), the North Shore (Deux-Montagnes) and the airport in a unified, fully automated, 67km light rail transit (LRT) system comprising 24 stations and operating 20 hours a day, 7 days a week. The solution proposed by CDPQ Infra wi
  • China paves way to enhanced safety with C-V2X
    September 30, 2021
    China is blazing a trail for C-V2X technology and paving the way for deployments worldwide, explains Qualcomm Technologies' Jim Misener
  • $350m New Orleans BRT scheme gets green light from city
    March 31, 2023
    RTA can now apply for federal funding from Bipartisan Infrastructure Bill for 50% of cost