Skip to main content

Vancouver narrows bridge & tunnel options

The Burrard Inlet Rapid Transit Study has now identified five potential crossings
By David Arminas September 21, 2020 Read time: 2 mins
Transport crossings in Vancouver: more needed (© Vismax | Dreamstime.com)

The British Columbia government has identified five potential crossings for the proposed high-capacity rapid transit across the Burrard Inlet from Vancouver to the North Shore.

The technical feasibility study, led by engineering consultancy Mott MacDonald Canada, has come up with three tunnel and two bridge proposals for cars and buses.

The plan will help inform the long-term Transport 2050 planning, led by TransLink and the Mayors’ Council, according to a statement by the BC government’s Ministry of Transportation and Infrastructure.

Possible routes for future planning consideration (see map below) are:

  • Downtown Vancouver to Lonsdale via First Narrows (tunnel)
  • Downtown Vancouver to Lonsdale via Brockton Point (tunnel)
  • Downtown Vancouver to West Vancouver via Lonsdale (tunnel)
  • Downtown Vancouver to Lonsdale via Second Narrows (new bridge)
  • Burnaby to Lonsdale via Second Narrows (new bridge)

The ministry, the districts of North Vancouver and West Vancouver and the cities of Vancouver and North Vancouver all contributed funding towards the study. TransLink oversaw the technical work.

The technical feasibility study was also the first to be a co-ordinated effort by the BC province in partnership with Indigenous governments, municipalities and TransLink to identify a potential rapid transit solution across the Burrard Inlet.

TransLink is the Vancouver area’s regional transportation authority coordinating transit throughout the lower mainland area – around the Fraser River Valley.

The Mayors' Council, set up by TransLink, is composed of representatives from each of the 21 municipalities within the transportation service region. It also includes Indigenous – native American - groups such as the Tsawwassen First Nation.

Improved transit is part of the BC government’s CleanBC plan that aims to reduce congestion and carbon pollution. CleanBC was developed in collaboration with the BC Green Party, an environmental political party.

Vancouver transit plan
Map courtesy of British Columbia Ministry of Transportation and Infrastructure

 

UTC

Related Content

  • July 2, 2024
    Multimodal link-up in Vancouver
    Metro Vancouver sees the value in seamless travel between modes and is pushing ahead with a new pilot designed to make it a reality. David Arminas reports on the RideLink project
  • December 6, 2012
    New Port Mann Bridge opens to eight lanes of traffic
    Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
  • February 22, 2022
    Cubic brings Umo to British Columbia 
    Platform is to offer a single electronic fare collection solution for more than 900 buses
  • February 17, 2021
    Building back better after Covid-19
    The Canadian Urban Transit Association has looked carefully at what’s required to put public transportation on a firm footing post-Covid: here are a few of the group’s recommendations…