Skip to main content

Vancouver explores new rapid transit crossing

A feasibility study in the Canadian city of Vancouver is to explore six routes for a potential new transit crossing across the Burrard Inlet to the North Shore. 
By Ben Spencer March 9, 2020 Read time: 2 mins
Vancouver's Lions Gate Bridge is one of the main current crossings (© ArchonCodex | Dreamstime.com)

Claire Trevena, minister of transportation and infrastructure for the government of British Columbia, says: “We know that people living and working on the North Shore are frustrated with traffic congestion that has been increasing for years.”

“By investing in this study, our government is helping to take a serious look at solutions that expand our public transportation network to better connect communities and to help people move around freely.”

One of the main current crossings is via the iconic Lions Gate Bridge (pictured above), which takes vehicles, bikes and pedestrians. 

The six new routes to be explored (see map below) are:

•    Downtown Vancouver to Lonsdale via Brockton Point (tunnel)
•    Downtown Vancouver to West Vancouver via Lonsdale (tunnel)
•    Downtown Vancouver to Lonsdale via Second Narrows (new bridge)
•    Burnaby to Lonsdale via Second Narrows (new bridge)
•    Burnaby to Lonsdale via Second Narrows (existing bridge)
•    Downtown Vancouver to Lonsdale via First Narrows (tunnel)

Connecting Lonsdale City Centre with Vancouver’s metropolitan area and the regional rapid transit network was put forward by the Integrated North Shore Transportation Planning Project (INSTPP) in 2018.

Bowinn Ma, member of the British Columbia Legislative Assembly for North Vancouver-Lonsdale, who leads INSTPP, says: “This technical feasibility study to find a rapid transit solution across the Burrard Inlet is an important step toward a third fixed-link crossing to the North Shore.”

The Ministry of Transportation and Infrastructure, the districts of North Vancouver and West Vancouver, and the cities of Vancouver and North Vancouver are funding the study while TransLink is leading the procurement process. 

The results of the study will be used to inform the development of Transport 2050, TransLink’s updated regional transportation strategy. 

Vancouver: the transit options

Related Content

  • Editor's comment: 'Time to press the re-set button'
    July 13, 2020
    Holistic solutions are required on air quality and inequality - and the ITS industry is involved
  • Jenoptik sees value in international outlook
    June 13, 2024
    Technology is always changing in the traffic management sector. Tobias Deubel of Jenoptik talks to Adam Hill about the past, the future – and the importance of global partnerships
  • And what if MaaS were an opera?
    September 2, 2021
    How do the roles of the various players in successful Mobility as a Service operations play out? Aurélien Cottet thinks it’s worth looking at this complex question from an unusual perspective…
  • Canada invests in Vancouver’s EV charging infrastructure
    February 15, 2019
    The government of Canada is investing CAN$300,000 in the construction of six electric vehicle (EV) fast chargers in Vancouver. This funding is part of the government’s CAN$182.5m investment to develop a fast-charging network for EVs and establish natural gas stations along roads and hydrogen stations in metropolitan areas. The chargers are partially funded through the Electric Vehicle and Alternative Fuel Infrastructure Deployment Initiative, a programme which falls under Canada’s $180 billion Inves