Skip to main content

US DOT announces funding opportunity to improve transit bus service

The US Department of Transportation’s (US DOT) Federal Transit Administration (FTA) has announced approximately US$226.5 million in competitive grant funding for transit bus projects nationwide.
July 14, 2017 Read time: 1 min

The 324 US Department of Transportation’s (US DOT) 2023 Federal Transit Administration (FTA) has announced approximately US$226.5 million in competitive grant funding for transit bus projects nationwide.

The Grants for Buses and Bus Facilities Infrastructure Investment Program has been authorised by Congress to improve the condition of bus infrastructure nationwide by funding the replacement and rehabilitation of buses and related facilities. The application period will close on 25 August 25 2017 at 11:59 pm.

All projects must comply with Buy America regulations, which require that all iron, steel or manufactured products be produced in the United States, as well as final assembly of vehicles. Eligible projects include those that replace, rehabilitate, lease and purchase buses and related equipment as well as projects to purchase, rehabilitate, construct or lease bus-related facilities, such as buildings for bus storage and maintenance.

FTA will award the Bus Infrastructure grants to designated recipients, states or local governmental entities that operate fixed route bus service and Indian tribes. Projects will be evaluated by criteria outlined in the Notice of Funding Opportunity. The program allocates a minimum of ten per cent, US$22.6 million, to rural bus needs.

For more information on companies in this article

Related Content

  • Greensboro Transit Authority lo debut Poterra electric bus fleet
    November 15, 2017
    Manufacturer of zero-emission heavy-duty vehicles Proterra has announced that Greensboro Transit Authority (GTA) will purchase four of its electric buses this fall as part of a joint effort to minimize emissions, reduce traffic congestion and accelerate sustainable infrastructure development. The 40-foot Proterra buses will replace retiring fossil fuel buses and are designed with the intention of eliminating more than 1.2 million lbs of greenhouse gas (GHG) emissions. Over their 12-year lifespan, the
  • Belarus toll system expanded
    August 7, 2014
    The BelToll electronic toll collection system, implemented and operated by Kapsch TrafficCom in Belarus, Serbia, was expanded by another 256 kilometres at the beginning of August, just one year after its commissioning in 2013. The system, which was also expanded by 815 kilometres in January 2014, is now 1,189 kilometres long; according to Kapsch TraffiCom, the number of registered vehicles has more than trebled since the system was put into operation, increasing from 60,000 to 190,000 vehicles.
  • GPS accuracy concern in US
    April 17, 2012
    Pressure is growing in the US over concerns that GPS accuracy could be affected. A coalition has formed that comprises an array of the leading construction equipment manufacturers, GPS technology providers and other concerned bodies including those from the agricultural and airline industries. The coalition claims that up to 3.3 million US jobs could be affected by the threat to GPS accuracy, with an economic impact of some US$96 billion in annual direct economic benefits to the US economy.
  • Crossrail project receives US$814 million EIB funding
    December 16, 2013
    The European Investment Bank (EIB), Europe’s long-term lending institution, has provided further funds to support the latest step in Crossrail’s development with a loan of up to US$814 million to Transport for London (TfL). The facility will be used for financing a fleet of new high-capacity air-conditioned trains as well as a new maintenance depot. Finance contracts were signed in London this week by Steve Allen, TfL’s Managing Director Finance and Jonathan Taylor, European Investment Bank Vice President.