Skip to main content

UK tunnel officially opened

UK transport secretary Philip Hammond yesterday cut the ribbon at the Hindhead twin bore tunnel in Surrey, signifying the end of a US$605 million, 1.8 km-long bypass of Hindhead village on the A3 between London and Portsmouth. The new tunnels will be used by 30,000 vehicles/day.
April 20, 2012 Read time: 1 min
UK transport secretary Philip Hammond yesterday cut the ribbon at the Hindhead twin bore tunnel in Surrey, signifying the end of a US$605 million, 1.8 km-long bypass of Hindhead village on the A3 between London and Portsmouth. The new tunnels will be used by 30,000 vehicles/day.

‘This new road will transform journeys on the A3 – improving journey times by around 20 minutes or more at busy periods – and will deliver a threefold return on investment for the economy,” Hammond said. “This cutting-edge road scheme has surpassed expectation in almost every way, and sets a new standard for how vital infrastructure improvements can be delivered,” he added.

Hammond pointed out that the tunnel contains state-of-the-art safety features, including the UK’s first radar-based incident detection system and 100% CCTV coverage.

Another safety feature was the inclusion of Astucia hardwired bi-directional LED road studs to guide motorists safely through the tunnel. A total of 868 of the studs emit a full 180 degrees of illumination when switched from uni-directional to bi-directional delineation should one of the tunnels be switched to contra flow mode.

Related Content

  • Ford Mobility: analytics aids transport proactivity
    April 2, 2020
    Ford Mobility has demonstrated how data analytics can help implement London's transport strategy in areas such as traffic re-timing and in eliminating all road fatalities (Vision Zero) by 2041.
  • MaaS Market London: transport revolution
    June 11, 2019
    ITS International’s third MaaS Market conference in London provoked lively discussions about micromobility, AVs, the stupidity of car drivers - and Star Trek. Adam Hill was taking notes…
  • Eurasia tunnel opens
    December 22, 2016
    Turkey’s Eurasia tunnel, which links the European peninsula with the motorway network on the Asian side, has opened to traffic. The 5.4km long two-story tunnel, which is expected to alleviate Istanbul’s heavy congestion, aims to cut the travel time between the two sides of Istanbul by 85 minutes to only 15 minutes. Around 120,000 cars and light vehicles are expected to travel through the tunnel each day. The project also includes the construction of an additional 10km of access roads, two toll plazas
  • Sanef awarded major Dartford Crossing toll contract
    October 7, 2013
    The UK Highways Agency has awarded the US$589 million contract for the design, implementation, delivery and operation of the new free-flow charging system to sanef. The seven-year deal includes the opportunity to extend up to a further three years. New technology will allow drivers to use the crossing without having to stop at the barriers to hand over payment. Road users will be able to pay through a variety of methods including telephone, text, online and at retail outlets. Pre-paid accounts which qual