Skip to main content

UK lane rental schemes set to go nationwide to help reduce congestion

UK lane rental schemes, where utility companies can be charged up to £2,500 ($3,499) each day for digging up the busiest roads at peak times, can be adopted by councils as part of a government approved strategy to help reduce congestion. The announcement follows successful trials conducted in London and Kent. This scheme aims to incentivise firms to work on quieter roads or outside of rush hour as well as collaborate with other companies to prevent roads from being dug up multiple times. Around 2.5 mi
February 20, 2018 Read time: 2 mins
UK lane rental schemes, where utility companies can be charged up to £2,500 ($3,499) each day for digging up the busiest roads at peak times, can be adopted by councils as part of a government approved strategy to help reduce congestion. The announcement follows successful trials conducted in London and Kent.


This scheme aims to incentivise firms to work on quieter roads or outside of rush hour as well as collaborate with other companies to prevent roads from being dug up multiple times.

Around 2.5 million roadworks are carried out each year, costing the economy £4bn ($5.5bn) in increased costs to businesses through late employees or deliveries.

The 1837 Department for Transport will provide guidance in the autumn to help councils develop lane rental schemes for approval. Initial schemes could start by the end of 2019.

Jo Johnson, transport minister, said: “Drivers often see red when roadworks cause them delays, especially if no one is working on them. Lane rental has seen a massive drop in disruption to drivers as utility companies have changed when and where they carry out work. Now we want millions of motorists around England to get the same benefits.

“The Department for Transport carried out a consultation into the scheme last year, and the majority of those responding supported its rollout nationwide. Many said they wanted to take advantage of the ‘clear benefits’ of lane rental schemes.”

Mike Cherry, Federation of Small Businesses, national chairman, responding to the announcement, said: “Congestion on roads is an ongoing and frustrating concern for those that run and work for small businesses and their customers.

"Our own research shows 45% of small firms identify congestion on local roads as their top transport concern, while 31% said frequent roadworks are a major issue affecting their business, in particular the length of time taken to complete the work.

“Getting stuck in traffic costs valuable time and money, so a plan that cuts down on this is a welcome one.”

UTC

Related Content

  • July 20, 2015
    UK to lead the way in testing driverless cars
    The UK government has launched a US$30 million competitive fund for collaborative research and development into driverless vehicles, along with a code of practice for testing. The measures, announced by Business Secretary Sajid Javid and Transport Minister Andrew Jones, will put the UK at the forefront of the intelligent mobility market, expected to be worth US£1.4 trillion by 2025. The government wants bidders to put forward proposals in areas such as safety, reliability, how vehicles can communicat
  • July 27, 2012
    Measuring vehicle lengths with a single loop - promising results
    District 7 of Caltrans has been conducting trials to see whether the use of a single inductive loop to measure vehicle lengths and so identify heavy trucks is feasible. So far, the results have been very promising, according to Lead Transportation Engineer Steve Malkson. Between them, the adjoining ports of Los Angeles and Long Beach, the US's two biggest, cover some 10,700 acres (43km2) and 68 miles (109km) of waterfront.
  • May 26, 2016
    Vehicle to improve safety and reduce disruption on motorways
    Inspired by the aviation industry, a new vehicle developed by Highways England to help replace overhead signs is set to reduce the duration of roadworks. The vehicle is based on the design of an aircraft catering vehicle, which loads refreshments into aeroplanes using a hydraulic scissor lift. Traditionally, signs are taken down and installed using a flat-bed truck, crane and cherry picker, taking up to 40 minutes. However the new Maintenance Assistance Vehicle (MAV) can do this in around 20 to 25 min
  • October 18, 2018
    Van driver banned for ignoring motorway incident road block
    A van driver who ignored a Highways England road block on the UK’s M42 motorway has been banned from driving for six months. The case highlights the need for incident zone safety: the road block had been put in place by traffic officers following a fatal crash. Richard Leonard, head of road safety at Highways England, said: “We hope this case sends out an important message because those who ignore road closures put other people’s safety in jeopardy and this was clearly the case here for our traffic officers