Skip to main content

UK government’s US$283 million road building boost for Bedfordshire

Two road-building schemes worth US$283 million, which are a key part of the UK government’s long-term economic plan for Bedfordshire, are on course to be delivered on time and on budget by spring 2017. The 2.8 mile, US$229 million A5-M1 Link scheme is being delivered by Highways England, while the US$54 million, 1.8 mile Woodside Link project is being completed by Central Bedfordshire Council. The A5-M1 Link dual carriageway project is intended to improve the east-west connection between the A5 and M1
March 4, 2016 Read time: 2 mins
Two road-building schemes worth US$283 million, which are a key part of the UK government’s long-term economic plan for Bedfordshire, are on course to be delivered on time and on budget by spring 2017.

The 2.8 mile, US$229 million A5-M1 Link scheme is being delivered by 8101 Highways England, while the US$54 million, 1.8 mile Woodside Link project is being completed by Central Bedfordshire Council.

The A5-M1 Link dual carriageway project is intended to improve the east-west connection between the A5 and M1, north of Dunstable and help reduce congestion through Dunstable town centre, offering motorists better journey time reliability and safer journeys. It includes the building of a completely new dualled road, three new junctions including a new motorway junction, and six new bridges.

The Woodside Link project will connect the industrial areas of Houghton Regis and Dunstable to a new M1 junction 11a. It is already attracting new businesses to the area. When open the 1.8 mile road will also reduce congestion on local roads and improve air quality.

Delivering the schemes will unlock up to 40 hectares of land for businesses and provide the infrastructure for 7,000 homes to be built to the north of Houghton Regis. They will also provide better access to the M1 and reduce congestion in Dunstable.

For more information on companies in this article

Related Content

  • EV sales stalling in the UK
    April 17, 2012
    The number of electric cars sold in the UK has fallen by over 50 per cent to just 215 in the first three months of the year despite Government incentives, according to figures from the RAC Foundation.Since 1 January, individuals and businesses have been able to claim a discount of up to £5,000 (US$8,193) on cars producing 75 g CO2/km or less under the Government’s Plug-In Car Grant scheme. A total of 680 cars have been purchased under the programme, taking the number of electric cars registered in the UK to
  • Europe will have over two million public charging points by 2017
    April 19, 2012
    A new report from Frost & Sullivan - “Strategic Technology and Market Analysis of Electric Vehicle Charging Infrastructure in Europe” predicts that the electric venicle (EV) charging infrastructure market could grow from less than 10,000 charging stations in 2010 to more than two million in 2017, 3% of which would be based on very-fast charging and inductive charging. “We are awaiting that European governments will forecast a budget of €700 million over the next seven years to build a charging infrastruc
  • Upgrading Koblenz's traffic information system
    March 1, 2013
    David Crawford reviews an award-winning scheme that delivered a 30% increase in website usage – below budget The German Federal Agricul­tural Show (Bundesgarten­schau, BUGA) runs between mid-April and mid-October every other year in a differ­ent city. The most recent, 2011, edition took place in Koblenz, a medium-sized community with a population of just over 105,000 in the Rheinland-Pfalz region, and was expected to draw an additional 40,000 visitors a day to its central area. Traffic access from the moto
  • Cost benefit: Wichita eases workzone congestion
    July 8, 2019
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut