Skip to main content

Transurban lights up tunnel to help drivers pace themselves

Steep exit from Burnley Tunnel creates congestion for Melbourne's wider road network
By Adam Hill March 31, 2023 Read time: 2 mins
Green band of moving light gives drivers visual cue to maintain speed (image: Transurban)

Transurban has introduced 'pacemaker' lighting - a green band of moving light - for drivers in Melbourne's Burnley Tunnel in a bid to help improve traffic flow across the Australian city's road network.

Part of a makeover for the tunnel, the pacemaker lights are designed to help drivers maintain a consistent speed: the lighting system is fully dynamic, with the speed of the lights dependent on the speed of vehicles at various points throughout the tunnel.

The lights act as a visual cue in drivers' peripheral vision to maintain a consistent speed. - particularly as they travel uphill towards the exit. 

"The Burnley Tunnel is much steeper and deeper than people realise, with drivers descending some 65m below the Yarra River, then back up again as they exit the tunnel," the company says in a statement.

"This causes drivers to exit the tunnel at a lower speed than they entered, causing a backlog of congestion. So it can be common that there’s a hold up in the Burnley Tunnel even when there’s no incident."

While most drivers enter the Burnley Tunnel at the 80km/h speed limit, they are exiting about 60km/h, not noticing their speed has dropped as they climb the slope on the way out.

Transurban says the lights will never move faster than the tunnel speed limit of 80km/h, and will be switched off during any incident.

The West Gate Freeway to Burnley Tunnel is one of the busiest stretches of road in Australia and Transurban says: "There’s always going to be some level of congestion in the tunnel during peak times."

"There is no silver bullet to eliminating congestion along this busy stretch of road, and this is about making drivers aware of the slope in the tunnel, that they may be losing speed on the uphill and providing a visual cue in their peripheral vision through the pacemaker lights to remind them to maintain a consistent speed."

The company says it is "constantly reviewing the data and fine-tuning the technology to see how these lights can continue to give us the enhancements we’re looking for".
 

Related Content

  • August 3, 2020
    Elon Musk’s underground movement
    The Boring Company is building tunnels under various US cities – but for what? Kristina Smith delves deep into a project which may (eventually) have real appeal for mass transit providers and transportation agencies
  • December 5, 2017
    New Mersey crossing ends Halton’s congestion misery
    Plagued by intolerable congestion but denied government funding for its solution, tiny Halton Borough Council relentlessly pursued its vision and achieved what many believed impossible. Halton may be a small local authority in north west England, but it had a big traffic problem. However, as the road, or more particularly the bridge, involved was not deemed a strategic route, central government would not commission or even fund a solution - a problem that many other local authorities will recognise.
  • September 15, 2014
    Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • May 11, 2017
    Lindsay zips-up lane closure solution
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.