Skip to main content

TransCore wins three ITS contracts from Nevada DOT

TransCore has won three separate contracts to provide ITS design, construction and integration services for the Nevada Department of Transportation. The projects include a 30-mile extension of the FAST traffic management system along I-15 from outside Las Vegas to the California border; a 15-mile expansion of the FAST traffic management system along I-515 on the eastern side of the Las Vegas metropolitan area; and a 10-mile segment of I-80 in Reno, Nevada, as part of a roadway reconstruction project.
April 25, 2012 Read time: 3 mins
RSS139 Transcore has won three separate contracts to provide ITS design, construction and integration services for the Nevada Department of Transportation. The projects include a 30-mile extension of the FAST traffic management system along I-15 from outside Las Vegas to the California border; a 15-mile expansion of the FAST traffic management system along I-515 on the eastern side of the Las Vegas metropolitan area; and a 10-mile segment of I-80 in Reno, Nevada, as part of a roadway reconstruction project.

Nevada’s Freeway and Arterial System of Transportation (FAST) is one of the first integrated ITS organisations in the country. It is designed to both monitor and control traffic throughout the Las Vegas metropolitan area. The traffic control component of the system consists of freeway and arterial management. Traffic control requires detection of traffic conditions through the use of radar and inductive loops while visual verification of conditions is possible through closed-circuit television cameras. Traffic control is achieved through the use of traffic signals, ramp meters, and dynamic message signs.

The I-15 ITS design-build contract will extend FAST capabilities along a major commercial and public transportation corridor and includes: construction of a new communications network to support field devices along the 30 miles of freeway; designing a detection network; deploying highway advisory radio along the corridor; installing closed circuit television cameras, dynamic message signs, and travel time signs at key points within the corridor; and integration of all systems into the FAST traffic management system.

TransCore assembled a team with extensive experience working with NDOT. The team consists of TransCore as the prime contractor and lead ITS integrator; 1677 Atkins, formerly PBS&J, as the principal designer; Aztech Materials and Testing will provide construction quality control; while Amalgamated Safety Contractors traffic control support and sign structure installation.

In the competitive procurement Nevada DOT gave TransCore the highest technical score as well as a perfect score on best value pricing. The value of the contract is $13.5 million; project completion is slated for fourth quarter 2012.

The I-515 contract includes the construction of a fibre optic communications network, deploying detectors, CCTV cameras and dynamic message signs along this important commuter corridor and alternative route to the busy I-15 corridor. All new devices will be integrated with the existing FAST system. TransCore’s contract for this project is valued at $9 million and the project is scheduled for completion in the first quarter of 2012.

The I-80 project, which will be the first major ITS deployment along I-80 in the Reno area, is being performed as part of a larger design-build project to reconstruct I-80 being led by Granite Construction. The project will include the deployment of a work zone management system to monitor traffic condition during the roadway reconstruction, installing a fibre optic communications network, and installing and integrating detectors, cameras, dynamic message signs and ramp meters. This work is scheduled for completion in the second half of 2012. TransCore’s contract for this project is valued at $6.5 million.

For more information on companies in this article

Related Content

  • Florida plans new ITS network
    October 9, 2013
    The Florida Department of Transportation (FDOT) is to begin work on a US$24 million intelligent transportation system (ITS) network in north-west Florida. The network will include 183 traffic cameras, 17 overhead message signs, 135 microwave vehicle detectors, 40 travel time sensors, three road and weather information sensors and eight highway advisory radios.
  • Texas DOT reselects Atkins toll-plaza contract
    February 28, 2014
    The Texas Department of Transportation (TxDOT) has reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, US$10 million contract, Atkins will provide planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing services for TxDOT toll and managed-lane facilities throughout Texas. TxDOT currently operates more than 493 lan
  • Tecsidel’s Pan-American Highway tunnel eases Lima’s traffic woes
    December 4, 2018
    The Pan-American Highway connects the US and Canada with Latin America, running for thousands of miles from Alaska in the north to Argentina in the south. Mauro Nogarin finds that one tunnel built underneath it is now providing relief for thousands of travellers each day On the Pan-American Highway, the lengthy series of roads which spans both American continents - from the US state of Alaska to the Latin American country of Argentina - ITS solutions are many and varied. One of these, in Peru’s capital
  • NJDOT traffic signal coordination project begins
    April 8, 2013
    The New Jersey Department of Transportation (NJDOT) has started work on a much-needed congestion relief project, using technology to improve traffic flow along a thirteen mile stretch of Route 22 in Somerset and Union counties. The US$7.77 million project will improve mobility along the entire corridor through the creation of an integrated system interconnecting eighteen traffic signals into one controlled traffic signal system (CTSS). This includes the complete replacement of the existing traffic signal sy