Skip to main content

Thales - Balfour Beatty Rail consortium awarded €400 million Danish contract

Banedanmark, the Danish infrastructure owner, has awarded the Thales - Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland.
March 14, 2012 Read time: 2 mins
3901 Banedanmark, the Danish infrastructure owner, has awarded the 596 Thales - 3902 Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland. This comprises approximately 60 per cent of Denmark’s railway network and is claimed to be one of the largest signalling contracts ever awarded in the world.

Banedanmark has decided to totally renew the existing signalling system with a new technologically advanced system to increase the attractiveness of rail transport. The improvements that will be gained will comprise of improved punctuality and higher utilisation of the tracks and more readily available information. The system being installed is the European Train Control System (ETCS Level 2), a signalling, control and train protection system that is gradually being introduced across Europe to replace the many incompatible safety systems currently in use.

The contract involves the use of the Thales ETCS Level 2 signalling solution but also interlocking combined with rail field equipment and a traffic management system; the track-side installation being carried out by Balfour Beatty Rail in Denmark. Together the consortium, led by Thales, will deliver a turn-key service including project management, technical management migration of the legacy system under the running operation and maintenance.

The challenge is to install the signalling solution with minimal disruption to the network operations and introduce it into service seamlessly. The delivery is planned from 2014 to 2021.

For more information on companies in this article

Related Content

  • High speed surfing in France and Italy
    May 18, 2012
    Two announcements on the same day – from the OCEA Consortium and from Andrew Solutions - have reported overcoming the challenges of internet access in high-speed trains travelling at over 200mph (320km/h) in France and Italy. The technological achievements realised by the consortium have risen to the challenge of ensuring service at high speed in a high voltage electrical environment, and integrating the system's maintenance into the overall maintenance schedules of a high-speed network with no impact on th
  • UK VMS manufacturers merge
    April 2, 2015
    Two major companies in the field of signage systems for highways, urban and rail sectors have joined forces, Variable Message Signs Limited (VMSL) and Techspan Systems, creating a stronger business with a broad product range and an extensive technical capability. Following the acquisition of VMSL in 2014, Hill & Smith Limited realised the opportunity to create a world class provider of variable message signs and systems as part of its HS Roads Technology Division. The new combined business will operate und
  • Confirm OnDemand used to maintain Southampton’s highways
    May 18, 2012
    Pitney Bowes Business Insight has announced that Balfour Beatty WorkPlace has chosen Confirm OnDemand – PBBI’s on-demand-based infrastructure asset maintenance and management system – to support its US$158 million Highways Services Partnership with Southampton City Council in the UK. Southampton City Council had previously been using Confirm as an on-premise application to manage its highways maintenance programme. Through integration with PBBI’s MapInfo Professional location intelligence GIS software, the
  • Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system
    August 5, 2016
    An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor