Skip to main content

Thales - Balfour Beatty Rail consortium awarded €400 million Danish contract

Banedanmark, the Danish infrastructure owner, has awarded the Thales - Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland.
March 14, 2012 Read time: 2 mins
3901 Banedanmark, the Danish infrastructure owner, has awarded the 596 Thales - 3902 Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland. This comprises approximately 60 per cent of Denmark’s railway network and is claimed to be one of the largest signalling contracts ever awarded in the world.

Banedanmark has decided to totally renew the existing signalling system with a new technologically advanced system to increase the attractiveness of rail transport. The improvements that will be gained will comprise of improved punctuality and higher utilisation of the tracks and more readily available information. The system being installed is the European Train Control System (ETCS Level 2), a signalling, control and train protection system that is gradually being introduced across Europe to replace the many incompatible safety systems currently in use.

The contract involves the use of the Thales ETCS Level 2 signalling solution but also interlocking combined with rail field equipment and a traffic management system; the track-side installation being carried out by Balfour Beatty Rail in Denmark. Together the consortium, led by Thales, will deliver a turn-key service including project management, technical management migration of the legacy system under the running operation and maintenance.

The challenge is to install the signalling solution with minimal disruption to the network operations and introduce it into service seamlessly. The delivery is planned from 2014 to 2021.

For more information on companies in this article

Related Content

  • UK's Hindhead tunnel pushes the boundaries of traffic management
    January 23, 2012
    The new Hindhead Tunnel is the first in the UK to use radar-based incident detection. Paul Arnold, project manager with the Highways Agency, talks about the project. The comparatively remote location of the A3 Hindhead Tunnel has resulted in it becoming one of the most sophisticated in the UK in terms of monitoring and control systems, according to Paul Arnold, project manager for the Highways Agency (HA), which manages strategic roads in England and Wales. It is the first tunnel in the UK to use radar for
  • Updated GreenRoad nearly eliminates posted speed violations
    April 23, 2012
    GreenRoad, the specialist in fleet driver performance and safety management, has added new functionality to GreenRoad 360 which includes posted speed performance, idling heat maps, and extended data integration with new APIs.
  • ITS solutions to keep truck traffic moving
    June 8, 2015
    David Crawford reviews freight management initiatives. Managing truck traffic to minimise its environmental impacts, without adversely impacting on its critical economic role, continues to drive ITS-based solutions in both urban and interurban contexts.
  • Kapsch to maintain UK rail GSM-R network
    December 17, 2012
    Austrian rail telecommunication systems integrator Kapsch CarrierCom has been awarded the contract to maintain the entire GSM-R (Global System for Mobile Communications – Railway) network on behalf of British railway infrastructure operator Network Rail. The multi-year agreement will see Kapsch supporting Network Rail’s control centre team to ensure the highest levels of network availability, enabling higher frequency of train services and greater safety standards. GSM-R is an international wireless communi