Skip to main content

Thales - Balfour Beatty Rail consortium awarded €400 million Danish contract

Banedanmark, the Danish infrastructure owner, has awarded the Thales - Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland.
March 14, 2012 Read time: 2 mins
3901 Banedanmark, the Danish infrastructure owner, has awarded the 596 Thales - 3902 Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland. This comprises approximately 60 per cent of Denmark’s railway network and is claimed to be one of the largest signalling contracts ever awarded in the world.

Banedanmark has decided to totally renew the existing signalling system with a new technologically advanced system to increase the attractiveness of rail transport. The improvements that will be gained will comprise of improved punctuality and higher utilisation of the tracks and more readily available information. The system being installed is the European Train Control System (ETCS Level 2), a signalling, control and train protection system that is gradually being introduced across Europe to replace the many incompatible safety systems currently in use.

The contract involves the use of the Thales ETCS Level 2 signalling solution but also interlocking combined with rail field equipment and a traffic management system; the track-side installation being carried out by Balfour Beatty Rail in Denmark. Together the consortium, led by Thales, will deliver a turn-key service including project management, technical management migration of the legacy system under the running operation and maintenance.

The challenge is to install the signalling solution with minimal disruption to the network operations and introduce it into service seamlessly. The delivery is planned from 2014 to 2021.

For more information on companies in this article

Related Content

  • Keolis begins first section of metro system in Hyderabad, India
    December 4, 2017
    Keolis has begun operating the first section, 30km, of a new automated metro system of Hyderabad, Telangana State, South East India. The project, launched by the Telangana government, will run across a 68km network of three lines and 65 stations in the next few years. Once completed, it is estimated to carry 1.3 million passengers daily aims to reduce road congestion and boost the local economy.
  • Do satellites provide a heavenly view of tolling’s future?
    December 16, 2014
    Satellite-based tolling opens up new options for authorities and can be integrated with DSRC systems as David Crawford discovers. As the proud custodian of the European Union (EU)’s longest road network covered by a single (truck) charging scheme – and the only one to include all major roads - Slovakia has become the continent’s poster-nation for the virtues of GNSS/CN (Global Navigation Satellite System/Cellular Network)-based tolling. It is also proved to be a very fast implementer. Speaking at the 2014 I
  • Smoothing out city freight movements
    May 28, 2014
    David Crawford welcomes a national first. Urban freight movements, while commercially and socially vital, are a growing logistical headache for planners and people alike. Figures from France’s Lyon Laboratory of Transport Economics indicate that goods transport in major urban areas accounts for: 20% of traffic; 35% of CO2 emissions made by all urban trips; and 50% of the diesel used; while final km delivery runs account for 20% of the total cost of the transport chain.
  • Romanian rail line to be modernised
    December 6, 2013
    Romanian state railway company CFR SA has awarded a contract worth US$519 million to a consortium including Strabag for the modernisation of the 42.2 kilometre long railway section between Vințu de Jos and Simeria in western Romania near the city of Sibiu. The modernisation works comprise the renovation of the railway section, including five stations located outside of the densely populated residential areas, rerouting of the track, tunnelling and bridge building as well as the track bed structure. In t