Skip to main content

Thales - Balfour Beatty Rail consortium awarded €400 million Danish contract

Banedanmark, the Danish infrastructure owner, has awarded the Thales - Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland.
March 14, 2012 Read time: 2 mins
3901 Banedanmark, the Danish infrastructure owner, has awarded the 596 Thales - 3902 Balfour Beatty Rail consortium, a €400 million contract for the installation of a state-of-the-art European signalling system on nearly 1,200 km of rail lines across Jutland. This comprises approximately 60 per cent of Denmark’s railway network and is claimed to be one of the largest signalling contracts ever awarded in the world.

Banedanmark has decided to totally renew the existing signalling system with a new technologically advanced system to increase the attractiveness of rail transport. The improvements that will be gained will comprise of improved punctuality and higher utilisation of the tracks and more readily available information. The system being installed is the European Train Control System (ETCS Level 2), a signalling, control and train protection system that is gradually being introduced across Europe to replace the many incompatible safety systems currently in use.

The contract involves the use of the Thales ETCS Level 2 signalling solution but also interlocking combined with rail field equipment and a traffic management system; the track-side installation being carried out by Balfour Beatty Rail in Denmark. Together the consortium, led by Thales, will deliver a turn-key service including project management, technical management migration of the legacy system under the running operation and maintenance.

The challenge is to install the signalling solution with minimal disruption to the network operations and introduce it into service seamlessly. The delivery is planned from 2014 to 2021.

Related Content

  • November 8, 2017
    Thales delivers automated train control systems to Santiago de Chile
    Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power. Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction. Together, both lines will have a combined length of 37km, with 28 station
  • November 27, 2014
    Consortium wins Mexico rail project
    A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway. The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services. The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio
  • May 14, 2018
    Network Rail launches digital strategy to improve travel experience
    Network Rail will carry out a digital railway strategy to help ensure that all new UK trains and signalling are digital or digital ready from 2019. The upgrade is aimed at improving the speed, punctuality and safety of the service. New digital rail technology will be utilised with the intention of allowing trains to run closer together and provide more frequent services. In addition, passengers are expected to be provided with improved mobile and WiFi connectivity. Train drivers will receive real-time
  • May 29, 2012
    Thales record Korea deployment
    Thales has delivered European Train Control System (ETCS) Level 1 systems for the Gyeongchun Line, a 81 km rail link in the north-east of Seoul, in South Korea, and the 89 km Jeolla Line serving Yeosu in the south of the country, host city for Expo 2012. The ITX (Intercity Train eXpress) Gyeongchun high-speed train service began operating in February after project completion to a tight schedule of just 18 months. Based on the quality of the systems and the work performed, the customer also selected Thales